Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung
Water is human’s basic need. Industrial area located near beach of North Jakarta can’t develop well if the amount of clean water is not adequate. Industrial area needs good quality water, cheap, and can be produced along of year. Kalimalang River, as Jakarta’s water source, undoubtly capable to f...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/41666 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:41666 |
---|---|
spelling |
id-itb.:416662019-08-28T14:22:18ZDesign of Water Pipe System from Kelurahan Pulo Gebang to Cakung Fieldianto, Rhino Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project water pipe, buried pipe, pipe bridge, cost analysis, pump installation, pipe installation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/41666 Water is human’s basic need. Industrial area located near beach of North Jakarta can’t develop well if the amount of clean water is not adequate. Industrial area needs good quality water, cheap, and can be produced along of year. Kalimalang River, as Jakarta’s water source, undoubtly capable to fulfill those requirements. But, because Kalimalang River is far from North Jakarta, there is a need to build water pipeline system. Water pipeline should be built with good plan and design to deliver good and economical output. Because of that reason, this thesis will make a plan of water pipeline appropriate with AWWA M11 and ASME B31.3. The planned pipeline is use steel pipe system from Kelurahan Pulo Gebang until Cakung, which is most of it will be buried and located near Lingkar Utara Jakarta Highway. Design process conducted by internal force analysis, external force analysis, hydraulic analysis, pump selection, and also cost analysis. Beside of those, design process also conducts pipe bridge structure design and modeling of whole pipeline in computer software by CAESAR II and Pipe Flow Expert. The conclusion are 16 inch schedule 20 steel pipe is used for pipe that buried in the side of highway and schedule 30 steel pipe for road crossing pipe. Water pipeline system using 100 horsepower booster pump. Water production cost per meter cubic of pipeline system is Rp 2.656 which is still under of market water cost. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik (Rekayasa, enjinering dan kegiatan berkaitan) |
spellingShingle |
Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Fieldianto, Rhino Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung |
description |
Water is human’s basic need. Industrial area located near beach of North
Jakarta can’t develop well if the amount of clean water is not adequate. Industrial
area needs good quality water, cheap, and can be produced along of year.
Kalimalang River, as Jakarta’s water source, undoubtly capable to fulfill those
requirements. But, because Kalimalang River is far from North Jakarta, there is a
need to build water pipeline system. Water pipeline should be built with good plan
and design to deliver good and economical output.
Because of that reason, this thesis will make a plan of water pipeline
appropriate with AWWA M11 and ASME B31.3. The planned pipeline is use
steel pipe system from Kelurahan Pulo Gebang until Cakung, which is most of it
will be buried and located near Lingkar Utara Jakarta Highway. Design process
conducted by internal force analysis, external force analysis, hydraulic analysis,
pump selection, and also cost analysis. Beside of those, design process also
conducts pipe bridge structure design and modeling of whole pipeline in computer
software by CAESAR II and Pipe Flow Expert.
The conclusion are 16 inch schedule 20 steel pipe is used for pipe that
buried in the side of highway and schedule 30 steel pipe for road crossing pipe.
Water pipeline system using 100 horsepower booster pump. Water production
cost per meter cubic of pipeline system is Rp 2.656 which is still under of market
water cost. |
format |
Final Project |
author |
Fieldianto, Rhino |
author_facet |
Fieldianto, Rhino |
author_sort |
Fieldianto, Rhino |
title |
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung |
title_short |
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung |
title_full |
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung |
title_fullStr |
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung |
title_full_unstemmed |
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung |
title_sort |
design of water pipe system from kelurahan pulo gebang to cakung |
url |
https://digilib.itb.ac.id/gdl/view/41666 |
_version_ |
1822926048274153472 |