PROPOSED DESIGN OF CIROYOM WASTE TRANSFER STATION FOR REGIONAL SCALE IN ANDIR SUB-DISTRICT OF BANDUNG CITY

Ciroyom TPS is one of the waste facilities in Andir Sub-district. Ciroyom TPS is managed by PD Kebersihan Kota Bandung which works as temporary solid waste collection from residential and Ciroyom Market. The large area of the TPS Ciroyom service area, which is 5 out of 6 villages that produce large...

Full description

Saved in:
Bibliographic Details
Main Author: Ivan Daniel, Oloan
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/42113
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Ciroyom TPS is one of the waste facilities in Andir Sub-district. Ciroyom TPS is managed by PD Kebersihan Kota Bandung which works as temporary solid waste collection from residential and Ciroyom Market. The large area of the TPS Ciroyom service area, which is 5 out of 6 villages that produce large amounts of waste that reaches 45.43 tonnes/day. This makes the amount of waste transportation from TPS to TPA reach 12 ritation/day. The distance from TPS Ciroyom to Sarimukti Regional Landfill which requires 44 km is a major consideration needed by the Waste Transfer Station (SPA) for regional scale. SPA takes in reducing the volume of waste so that it can reduce the ratio of garbage transportation to landfill (TPA). With adequate land area, TPS Ciroyonm has the potential to improve its function to become SPA for regional scale. Through analysis of several alternative concepts and development scenarios, the amount of waste generated will be managed at the SPA Ciroyom for the next 10 years. The main facilities designed at the SPA Ciroyom for regional scale are waste compaction units resulting in volume reduction with the vertical compression method. Through solidification of waste, residual waste classified as residues is expected to reduce the volume by 60-70%. In addition, other facilities are provided which are designed at Ciroyom Area Scale SPA such as waste sorting facilities using conveyor belts, organic waste processing with open windrow systems, and inorganic waste recovery facilities that still have selling points. Through the economic feasibility analysis of SPA development using Net Present Value (NPV), it was found that the construction of SPA facilities was not feasible to be realized because the NPV obtained was negative, namely - Rp. 8,696,958,898.00. However, the main purpose of this SPA design is to reduce the lifting of waste generation that must be transported to the landfill so that it can extend the service life of the reclaimed land rather than solely seeking economic benefits. While the costs needed to process waste can be obtained through user fees that must be paid to the community in the amount of Rp. 5,000.00 / month / house.