IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA

PT PPI is a subsidiary of Petron Corporation that operates the Romeo Oil and Gas production block in Riau Province under the Production Sharing Contract (PSC) with the Government of Indonesia for more than 90 years. In 2021, the PSC will end therefore PPI needs to complete all its responsibilitie...

Full description

Saved in:
Bibliographic Details
Main Author: Junianto N Jacob, Rocky
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/42338
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:42338
spelling id-itb.:423382019-09-18T14:28:36ZIMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA Junianto N Jacob, Rocky Manajemen umum Indonesia Theses motivation, employee motivation, team survey, motivational theory, implementation plan, result measures, process measures, behavior measures INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/42338 PT PPI is a subsidiary of Petron Corporation that operates the Romeo Oil and Gas production block in Riau Province under the Production Sharing Contract (PSC) with the Government of Indonesia for more than 90 years. In 2021, the PSC will end therefore PPI needs to complete all its responsibilities including to remediate Hydrocarbon Impacted Soil (HIS) scattered throughout the operational areas. HIS remediation project was formed for conducting the remediation and it soon realize that the biggest threat for success is low motivation of people assigned to the project. While the rest of the organization is slowing down, HIS remediation project is the only function with increasing workload and stress level due to pressure from multiple stakeholders and finite project timeline. To validate the business issue of low motivation, HIS team survey and targeted leaders interview was utilized. The result of this survey in combination with interview, confirms the premise of low motivation and the feedbacks were clustered into five themes. Solutions were later developed for each theme and issues mapping was created to see which solutions are solving the right theme. Additional solutions were selected with the alignment with motivational theories based on people cognitive abilities to rationalize their actions (expectancy theory, goal theory, and equity theory). Business solutions put into implementation and plan was constructed to sequence the activities and all actions are accompanied with result measures, process measures, and behavior measures. These measures will assist in progress checking and future adjustments to sustain discretionary efforts based on internal motivation. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Junianto N Jacob, Rocky
IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA
description PT PPI is a subsidiary of Petron Corporation that operates the Romeo Oil and Gas production block in Riau Province under the Production Sharing Contract (PSC) with the Government of Indonesia for more than 90 years. In 2021, the PSC will end therefore PPI needs to complete all its responsibilities including to remediate Hydrocarbon Impacted Soil (HIS) scattered throughout the operational areas. HIS remediation project was formed for conducting the remediation and it soon realize that the biggest threat for success is low motivation of people assigned to the project. While the rest of the organization is slowing down, HIS remediation project is the only function with increasing workload and stress level due to pressure from multiple stakeholders and finite project timeline. To validate the business issue of low motivation, HIS team survey and targeted leaders interview was utilized. The result of this survey in combination with interview, confirms the premise of low motivation and the feedbacks were clustered into five themes. Solutions were later developed for each theme and issues mapping was created to see which solutions are solving the right theme. Additional solutions were selected with the alignment with motivational theories based on people cognitive abilities to rationalize their actions (expectancy theory, goal theory, and equity theory). Business solutions put into implementation and plan was constructed to sequence the activities and all actions are accompanied with result measures, process measures, and behavior measures. These measures will assist in progress checking and future adjustments to sustain discretionary efforts based on internal motivation.
format Theses
author Junianto N Jacob, Rocky
author_facet Junianto N Jacob, Rocky
author_sort Junianto N Jacob, Rocky
title IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA
title_short IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA
title_full IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA
title_fullStr IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA
title_full_unstemmed IMPROVING EMPLOYEE MOTIVATION WORKING AT CRITICAL PROJECT NEARING END OF PRODUCTION SHARING CONTRACT OF PT PETRON PACIFIC INDONESIA
title_sort improving employee motivation working at critical project nearing end of production sharing contract of pt petron pacific indonesia
url https://digilib.itb.ac.id/gdl/view/42338
_version_ 1821998580732264448