EVALUATION OF PT AMNA POWERâS ABILITY TO FULFILL LONG TERM OBLIGATION
Government of Indonesia has opened more opportunities for private company to invest in electricity utilities sector since 2014 especially with 35GW initiative. The investment from private sector can be in the form of Independent Power Producer (IPP) or Private Power Utilities (PPU). Both forms of p...
Saved in:
Main Author: | Alin Amna, Fathimah |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/42525 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REFORMULATING COAL SALES STRATEGY TO FULFILL GOVERNMENTâS DOMESTIC MARKET OBLIGATION : STUDY IN PT HARAPAN BATUBARA TERDEPAN
by: Fahmi Irsan, Muhammad -
PROPOSED SOLUTIONS TO OPTIMIZE PRODUCTION COST IN FULFILLING THE COAL DOMESTIC MARKET OBLIGATIONS (STUDY CASE: PT XYZ)
by: Hawari, Regita -
ANALYSIS OF DOMESTIC COAL DEMAND PROJECTION TO FULFILL THE DOMESTIC MARKET OBLIGATION POLICY IN INDONESIA
by: Yogi Syahputra, Muhammad -
FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE
by: RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO -
FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER̉̉S HEAT RECOVERY STEAM GENERATOR
by: HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY