THE ANALYSIS OF CAPITAL BUDGETING MODEL FOR THE OVERLAND CONVEYOR AND SHIP LOADING FACILITIES PROJECT OF PT BATUBARA INFRA
The need for energy is one of the global needs. One source of energy is coming from coal conversion as a non-renewable energy resource with a low cost. Today, coal continues to be one of the most important source of electricity fuel in Indonesia. And word widely, the increase of demand of coal in wa...
Saved in:
Main Author: | Hedianto, Dasep |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/42578 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MISTRACKING ANALYSIS OF OVERLAND CONVEYOR PT. KALTIM PRIMA COAL AND PREVENTIVE RECOMMENDATIONS
by: (NIM : 13106111); Pembimbing: Dr. Ir. Rachman Setiawan, ANOFFIANTON -
ANALISIS PENYEBAB MISTRACKING PADA OVERLAND CONVEYOR PTKALTIM PRIMA COAL DAN REKOMENDASI TINDAKAN PENCEGAHAN.
by: Anoffianton -
INVESTMENT PROJECT ANALYSIS OF IN-LOADING CONVEYOR CASE STUDY OF PT. XYZ
by: Fahmi Artadi, Rudy -
PENGUJIAN MESIN PENGERING BATUBARA JENIS SCREW CONVEYOR DRYER.
by: Reza Indradi, Mohamad -
FINANCIAL FEASIBILITY STUDY AND JOINT OPERATION STRATEGY IN MINING INFRASTRUCTURE OF COAL TRANSPORT SUBSTITUTION FROM TRUCK HAULING TO OVERLAND CONVEYOR SYSTEM (A CASE STUDY OF PT.ABC)
by: Fahmi, Surya