The Study of Sustainable Procurement In The Procurement Of Ready mixed Supplier
Nowadays, the concept of sustainable construction has been known, namely the implementation of construction that considers social and environmental aspects in addition to the economic aspects. Sustainable construction has been mandated in Law Number 2 of 2017 concerning Construction Services. The...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/42614 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Nowadays, the concept of sustainable construction has been known, namely the implementation
of construction that considers social and environmental aspects in addition to the economic
aspects. Sustainable construction has been mandated in Law Number 2 of 2017 concerning
Construction Services. The success of sustainable construction is inseparable from the role of its
supply chain network, while the supply chain that will be involved is selected through the
procurement process, so that the procurement process needs to consider sustainable aspects as
well. The use of ready mixed concrete materials that are dominant in the construction process,
especially building construction has a large environmental and social impact, so in this study
will be discussed about sustainable procurement in the procurement of ready mixed concrete
suppliers carried out by Indonesian contractors in order to realize the implementation of
sustainable construction. The level of implementation of the procurement process of ready mixed
concrete suppliers by contractors will be compared with ISO 20400 which is a sustainable
guideline for flexible procurement and sustainable procurement best practices at the London
Olympics 2012 project as well as various literature on sustainable concrete work to see more
detailed about implementation of sustainable criteria of Ready mixed concrete job. The study
was conducted by analyzing qualitative data obtained through semistructured interviews
conducted on 4 BUMN contractors and 1 BUMS contractor in Indonesia that had carried out
green building projects. Based on the results of data processing and analysis, it was found that
the process of procuring concrete by the contractors fulfilled about 44% - 76% of the principle
of sustainable procurement at ISO 20400. In this study, an overview of the comparison of the
practices of sustainable procurement of ready mixed concrete suppliers is described by
contractors in Indonesia with ISO 20400 standards as well as sustainable procurement best
practices and what obstacles are faced in the implementation of sustainable procurement and
how contractors in Indonesia in the future can increase implementation of sustainable
procurement when procuring ready mixed concrete supplier.
|
---|