DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION

Many of Oil & Gas company conducting any efficiency and optimization program on their operational activity so they could stay competitive to survive on the business. One of the efficiency and optimization program is to ensure every facility that used on operation is in optimum condition and reli...

Full description

Saved in:
Bibliographic Details
Main Author: Luthfi, Ghazian
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/42696
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:42696
spelling id-itb.:426962019-09-23T11:05:22ZDECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION Luthfi, Ghazian Manajemen umum Indonesia Theses Kepner Tregoe Problem Analysis, Value Focused Thinking, Simple Multiple Attribute Rating Technique, Analytic Hierarchy Process, Decision Making INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/42696 Many of Oil & Gas company conducting any efficiency and optimization program on their operational activity so they could stay competitive to survive on the business. One of the efficiency and optimization program is to ensure every facility that used on operation is in optimum condition and reliable so it can be used to generate maximum production and minimize shutdown time that can cause production loss or LPO ( Loss Production Opportunity). Rangau water pipeline that operated by PT. PPI in recent years experiencing leakage problem which disrupted operational activities and also has potential hazard to local community at surrounding pipeline. Due to operational need, those water pipeline still used to support operational activities of PT. PPT, therefore it’s need a comprehensive analysis for repair and improvement plan to solve this pipeline issue. This final project is conducted to formulate the solution and recommendation for proposed alternative improvement of Environmental, Safety and Operational issue which identified on PT.PPI water pipeline. This final project is made for the selection of optimal solution from identified alternatives. Environmental, safety and operation issue have been evaluated by Kepner Tregoe (KT) Situational Appraisal. The root cause from environmental and safety issue then analyzed by KT – Problem Analysis and verified by 5 whys method. To obtain potential alternatives as the solution for the problem, Value Focused Thinking (VFT) method has been used. For alternative selection process, the combination of Analytic Hierarchy Process (AHP) and Simple Multi Attribute Rating Technique (SMART) method were used to evaluate the alternative. Qualitative analyses for pair wise comparison are made by group discussion that consist of four people that has deep knowledge and experience in Pipeline engineering, project management, construction and operational activities. Result from those analysis then will be proposed to the decision maker. The alternative which will be proposed to solve this issue is by full replacement with HDPE pipe. The result from this research then will be proposed to be a project that will be managed by project management concept. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Luthfi, Ghazian
DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION
description Many of Oil & Gas company conducting any efficiency and optimization program on their operational activity so they could stay competitive to survive on the business. One of the efficiency and optimization program is to ensure every facility that used on operation is in optimum condition and reliable so it can be used to generate maximum production and minimize shutdown time that can cause production loss or LPO ( Loss Production Opportunity). Rangau water pipeline that operated by PT. PPI in recent years experiencing leakage problem which disrupted operational activities and also has potential hazard to local community at surrounding pipeline. Due to operational need, those water pipeline still used to support operational activities of PT. PPT, therefore it’s need a comprehensive analysis for repair and improvement plan to solve this pipeline issue. This final project is conducted to formulate the solution and recommendation for proposed alternative improvement of Environmental, Safety and Operational issue which identified on PT.PPI water pipeline. This final project is made for the selection of optimal solution from identified alternatives. Environmental, safety and operation issue have been evaluated by Kepner Tregoe (KT) Situational Appraisal. The root cause from environmental and safety issue then analyzed by KT – Problem Analysis and verified by 5 whys method. To obtain potential alternatives as the solution for the problem, Value Focused Thinking (VFT) method has been used. For alternative selection process, the combination of Analytic Hierarchy Process (AHP) and Simple Multi Attribute Rating Technique (SMART) method were used to evaluate the alternative. Qualitative analyses for pair wise comparison are made by group discussion that consist of four people that has deep knowledge and experience in Pipeline engineering, project management, construction and operational activities. Result from those analysis then will be proposed to the decision maker. The alternative which will be proposed to solve this issue is by full replacement with HDPE pipe. The result from this research then will be proposed to be a project that will be managed by project management concept.
format Theses
author Luthfi, Ghazian
author_facet Luthfi, Ghazian
author_sort Luthfi, Ghazian
title DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION
title_short DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION
title_full DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION
title_fullStr DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION
title_full_unstemmed DECISION MAKING OF RANGAU WATER PIPELINE PROJECT ALTERNATIVE SELECTION
title_sort decision making of rangau water pipeline project alternative selection
url https://digilib.itb.ac.id/gdl/view/42696
_version_ 1821998677051310080