TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI

Buleleng Sub-district is one of the Sub-districts located in Buleleng Regency, Bali Province. Buleleng Sub-district consists of 29 villages with an area of 46.44 km2. Waste generation is expected to increase every year with population growth and urban growth. Waste problems in Buleleng Sub-district...

Full description

Saved in:
Bibliographic Details
Main Author: Ari Indra Rahayu, Made
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/42859
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:42859
spelling id-itb.:428592019-09-24T12:49:41ZTECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI Ari Indra Rahayu, Made Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project waste, technical planning, waste management INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/42859 Buleleng Sub-district is one of the Sub-districts located in Buleleng Regency, Bali Province. Buleleng Sub-district consists of 29 villages with an area of 46.44 km2. Waste generation is expected to increase every year with population growth and urban growth. Waste problems in Buleleng Sub-district are lack of public awareness of waste sorting at the source, unmanaged waste that has the potential to pollute the environment, and also Bengkala landfill predict will full at 2022. These problems underlie the need for develop of a waste management system in Buleleng Sub-district. The planned waste management system is a semi-centralized system. Waste management planning is based on primary data on waste sampling, observations, interviews and also questionnaires related to waste management in Buleleng Sub-district. Secondary data that support planning are national waste management strategic policies, regional strategic policies, regional spatial plans and Buleleng Regency waste management master plan. The planning period for 20 years in 2020 to 2040 with a moderate type of planning where the percentage of waste minimization at the end of the period reaches 52.62%.Planning includes sorting at sources, collection of rubbish, site selection of 3R facilities, processing of waste in 3R facilities. Based on the calculation results, TPS3R requires 12 units with a capacity of 3.89 tons / day to process organic and inorganic waste in 12 selected villages. Another planned 3R facility is the Composting Facility with a capacity of 23.5 tons / day to process organic waste from urban areas. Other waste management facilities that are also planned are 53 units of communal residue containers. The number of collection tools needed are 44 units to collect waste from the source to the residue container. The number of transportation equipment needed are trucks with five trucks to collect organic residue and two trucks to collect inorganic residue. Other programs that are also planned to support waste management in Buleleng Sub-district are the development of a waste bank, the separation of institutional regulators and operators of waste management, and the implementation of waste incentives and disincentives policies. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Ari Indra Rahayu, Made
TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI
description Buleleng Sub-district is one of the Sub-districts located in Buleleng Regency, Bali Province. Buleleng Sub-district consists of 29 villages with an area of 46.44 km2. Waste generation is expected to increase every year with population growth and urban growth. Waste problems in Buleleng Sub-district are lack of public awareness of waste sorting at the source, unmanaged waste that has the potential to pollute the environment, and also Bengkala landfill predict will full at 2022. These problems underlie the need for develop of a waste management system in Buleleng Sub-district. The planned waste management system is a semi-centralized system. Waste management planning is based on primary data on waste sampling, observations, interviews and also questionnaires related to waste management in Buleleng Sub-district. Secondary data that support planning are national waste management strategic policies, regional strategic policies, regional spatial plans and Buleleng Regency waste management master plan. The planning period for 20 years in 2020 to 2040 with a moderate type of planning where the percentage of waste minimization at the end of the period reaches 52.62%.Planning includes sorting at sources, collection of rubbish, site selection of 3R facilities, processing of waste in 3R facilities. Based on the calculation results, TPS3R requires 12 units with a capacity of 3.89 tons / day to process organic and inorganic waste in 12 selected villages. Another planned 3R facility is the Composting Facility with a capacity of 23.5 tons / day to process organic waste from urban areas. Other waste management facilities that are also planned are 53 units of communal residue containers. The number of collection tools needed are 44 units to collect waste from the source to the residue container. The number of transportation equipment needed are trucks with five trucks to collect organic residue and two trucks to collect inorganic residue. Other programs that are also planned to support waste management in Buleleng Sub-district are the development of a waste bank, the separation of institutional regulators and operators of waste management, and the implementation of waste incentives and disincentives policies.
format Final Project
author Ari Indra Rahayu, Made
author_facet Ari Indra Rahayu, Made
author_sort Ari Indra Rahayu, Made
title TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI
title_short TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI
title_full TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI
title_fullStr TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI
title_full_unstemmed TECHNICAL PLANNING OF WASTE MANAGEMENT IN BULELENG SUB-DISTRICT, BULELENG REGENCY, BALI
title_sort technical planning of waste management in buleleng sub-district, buleleng regency, bali
url https://digilib.itb.ac.id/gdl/view/42859
_version_ 1822270222372962304