DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS

The plan to develop the Cirebon Institute of Technology Bandung Campus will implement the concept of sustainable campus. One example of the concept of elaboration of Sustainable Campus is the presence of laboratory wastewater treatment in the ITB- Cirebon Campus. Planning of a Laboratory Wastewater...

Full description

Saved in:
Bibliographic Details
Main Author: Widyastuti
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/42864
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:42864
spelling id-itb.:428642019-09-24T13:06:20ZDESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS Widyastuti Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project WWTP, wastewater, laboratory, coagulation, flocculation, sedimentation, adsorption, constructed wetland. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/42864 The plan to develop the Cirebon Institute of Technology Bandung Campus will implement the concept of sustainable campus. One example of the concept of elaboration of Sustainable Campus is the presence of laboratory wastewater treatment in the ITB- Cirebon Campus. Planning of a Laboratory Wastewater Treatment Plant (WWTP) and its drainage system from each laboratory to WWTP are needed to implement Sustainable Campus in order to treat laboratory wastewater independently. There is 2 types of wastewater produced in laboratory, hazardous toxic wastewater and non hazardous toxic wastewater. Hazardous and toxic wastewater is the concentrated wastewater with high pollutant component in the wastewater. Non-HW is produced from practical activities such as the disposal of residual liquid practicum activities in sink and washing laboratory equipment. The hazardous and toxic wastewater will be prossed by third party. At present, there is no planning regarding wastewater treatment from non-HW laboratory activities at the ITB-Cirebon Campus. The planning of laboratory WWTP will be divided into 2 stages of development. The first stage (2020-2024) will be built 1 WWTP, named WWTP A which is intended to treat wastewater from TPB Basic Chemistry Laboratory and Craft Study Program Studio. The IPAL A treatment system plan will be operating in batch once a week. The second stage (2024-2032) will be built 1 WWTPs, namely WWTP B. IPAL B is intended to treat wastewater from the TPB Basic Chemistry Laboratory, Craft Study Program Studio, Chemical Engineering, Mechanical Engineering, Chemistry Study Program, Biology Laboratory, Civil Engineering, Oceanography, Environmental Engineering Laboratory, Physics Study Program, and Geophysical Engineering. The IPAL B treatment system plan will be operating in batch twice a week. There are parameters that must be processed in laboratory wastewater to meet the quality standards of Minister of Environment Regulation No.5 of 2014 concerning Waste Water Quality Standards. Some of the wastewater produced by the laboratory is still exceeding the quality standard, especially in the parameters BOD, COD, TSS, and metal content. By analyzing the parameters to treat, the selected treatment for the first stage WWTP (2020-2024) are coagulation-flocculation, sedimentation, and activated carbon adsorption, while the series of water treatment processes selected for second stage (2024-2036) is coagulation-flocculation, sedimentation, activated carbon adsorption and constructed wetland. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Widyastuti
DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS
description The plan to develop the Cirebon Institute of Technology Bandung Campus will implement the concept of sustainable campus. One example of the concept of elaboration of Sustainable Campus is the presence of laboratory wastewater treatment in the ITB- Cirebon Campus. Planning of a Laboratory Wastewater Treatment Plant (WWTP) and its drainage system from each laboratory to WWTP are needed to implement Sustainable Campus in order to treat laboratory wastewater independently. There is 2 types of wastewater produced in laboratory, hazardous toxic wastewater and non hazardous toxic wastewater. Hazardous and toxic wastewater is the concentrated wastewater with high pollutant component in the wastewater. Non-HW is produced from practical activities such as the disposal of residual liquid practicum activities in sink and washing laboratory equipment. The hazardous and toxic wastewater will be prossed by third party. At present, there is no planning regarding wastewater treatment from non-HW laboratory activities at the ITB-Cirebon Campus. The planning of laboratory WWTP will be divided into 2 stages of development. The first stage (2020-2024) will be built 1 WWTP, named WWTP A which is intended to treat wastewater from TPB Basic Chemistry Laboratory and Craft Study Program Studio. The IPAL A treatment system plan will be operating in batch once a week. The second stage (2024-2032) will be built 1 WWTPs, namely WWTP B. IPAL B is intended to treat wastewater from the TPB Basic Chemistry Laboratory, Craft Study Program Studio, Chemical Engineering, Mechanical Engineering, Chemistry Study Program, Biology Laboratory, Civil Engineering, Oceanography, Environmental Engineering Laboratory, Physics Study Program, and Geophysical Engineering. The IPAL B treatment system plan will be operating in batch twice a week. There are parameters that must be processed in laboratory wastewater to meet the quality standards of Minister of Environment Regulation No.5 of 2014 concerning Waste Water Quality Standards. Some of the wastewater produced by the laboratory is still exceeding the quality standard, especially in the parameters BOD, COD, TSS, and metal content. By analyzing the parameters to treat, the selected treatment for the first stage WWTP (2020-2024) are coagulation-flocculation, sedimentation, and activated carbon adsorption, while the series of water treatment processes selected for second stage (2024-2036) is coagulation-flocculation, sedimentation, activated carbon adsorption and constructed wetland.
format Final Project
author Widyastuti
author_facet Widyastuti
author_sort Widyastuti
title DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS
title_short DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS
title_full DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS
title_fullStr DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS
title_full_unstemmed DESIGN OF LABORATORY WASTEWATER TREATMENT PLANT IN ITB-CIREBON CAMPUS
title_sort design of laboratory wastewater treatment plant in itb-cirebon campus
url https://digilib.itb.ac.id/gdl/view/42864
_version_ 1822270224097869824