IMPROVING PROJECT EXECUTION BUDGET PERFORMANCE IN SOIL CLEAN UP PROJECT (A Study of Six Sigma in PT XYZ Environment Project)
Cost variation is a common phenomenon in project execution. Cost budgeting performance is very crucial for a project to see how the project is being executed. Cost variation can be caused by several factors and may not be the same for any project. Failing in achieving cost performance can result in...
Saved in:
Main Author: | Legawa, Patria |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/42920 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DIGITAL TRANSFORMATION PROJECT: DIGITALIZATION OF BUDGETING PROCESS AT XYZ
by: Amanda Umar, Shafira -
PRODUCTION TIME OPTIMIZATION BY SIX SIGMA DMAIC METHOD AT GOODS PROJECT CONVECTION
by: Auditha Vandri, Bobby -
IMPROVEMENT OF QUALITY ASSURANCE PROGRAM FOR PIPELINE REPAIR PROJECT IN OIL AND GAS COMPANY BY USING STATISTICAL QUALITY CONTROL AND SIX SIGMA
by: Aditia Buana Sucipto, Nur -
PROPOSED PROJECT MANAGEMENT SYSTEM FOR PT XYZ
by: Satiamulyana, Ardi -
STRENGTHEN THE PROJECT CONTROL MECHANISM IN MANAGING COAL MINING BUSINESS RISK WITH A CAPITAL BUDGETING APPROACH: STUDY IN PT. XYZ
by: Elisman, Ongky