BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT
Cikarang region is located in West Java Province. Cikarang is the largest industrial area in Southeast Asia. The distance from Tanjung Priok Port to the Cikarang Industrial Estate is ± 30 km. Container transportation which contains industrial raw materials for the Cikarang industrial area is stil...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43087 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:43087 |
---|---|
spelling |
id-itb.:430872019-09-25T14:09:32ZBASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT Prasetyo Bagaskoro, Bayu Indonesia Final Project inland waterway, lock system, HEC-RAS, flood discharge, mainstay discharge INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43087 Cikarang region is located in West Java Province. Cikarang is the largest industrial area in Southeast Asia. The distance from Tanjung Priok Port to the Cikarang Industrial Estate is ± 30 km. Container transportation which contains industrial raw materials for the Cikarang industrial area is still dominated by truck transportation so it is less efficient. CBL Inland Waterway is a water transportation cruise line in the form of a canal that functions to transport container logistics from Tanjung Priok Port to the Cikarang industrial area. The river bed elevation will increase as the canal is built upstream. Then we need an engineering in the form of a lock system so that ships can transport logistics further upstream. This lock system consists of 3 locations along the CBL canal flow. The lock system consists of a lock chamber and bywash. This channel system modeling uses HEC-RAS software to see the river flow behavior. Low discharge modeling is carried out by reviewing mainstay discharges as conditions that are reviewed against ship drafts. The criteria for container ships that can pass through the canal follows the planned ship from PT Pelabuhan Indonesia II, which has a capacity of 90 TEUs with a draft size of 2.8 meters, a length of 70 meters and a width of 12 meters. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Cikarang region is located in West Java Province. Cikarang is the largest industrial
area in Southeast Asia. The distance from Tanjung Priok Port to the Cikarang
Industrial Estate is ± 30 km. Container transportation which contains industrial
raw materials for the Cikarang industrial area is still dominated by truck
transportation so it is less efficient. CBL Inland Waterway is a water transportation
cruise line in the form of a canal that functions to transport container logistics from
Tanjung Priok Port to the Cikarang industrial area. The river bed elevation will
increase as the canal is built upstream. Then we need an engineering in the form of
a lock system so that ships can transport logistics further upstream. This lock
system consists of 3 locations along the CBL canal flow. The lock system consists
of a lock chamber and bywash. This channel system modeling uses HEC-RAS
software to see the river flow behavior. Low discharge modeling is carried out by
reviewing mainstay discharges as conditions that are reviewed against ship drafts.
The criteria for container ships that can pass through the canal follows the planned
ship from PT Pelabuhan Indonesia II, which has a capacity of 90 TEUs with a draft
size of 2.8 meters, a length of 70 meters and a width of 12 meters.
|
format |
Final Project |
author |
Prasetyo Bagaskoro, Bayu |
spellingShingle |
Prasetyo Bagaskoro, Bayu BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT |
author_facet |
Prasetyo Bagaskoro, Bayu |
author_sort |
Prasetyo Bagaskoro, Bayu |
title |
BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT |
title_short |
BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT |
title_full |
BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT |
title_fullStr |
BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT |
title_full_unstemmed |
BASIC DESAIN PENAMPANG DAN SISTEM LOCK KANAL INLAND WATERWAY CBL (CIKARANG-BEKASI-LAUT) DI BEKASI, JAWA BARAT |
title_sort |
basic desain penampang dan sistem lock kanal inland waterway cbl (cikarang-bekasi-laut) di bekasi, jawa barat |
url |
https://digilib.itb.ac.id/gdl/view/43087 |
_version_ |
1821998780051881984 |