THE EFFECT OF SEDIMENTATION IN CIRATA RESERVOIR TO ITS EFFECTIVE LIFETIME AND THE DESIGN OF SAND TRAP TO MAINTAIN THE REMAINING LIFETIME
By the year 2017, Cirata reservoir has already operated for more than 30 years with a lifetime plan of 100, supposedly Cirata Reservoir’s lifetime still has 70 years left. The annual sedimentation rate plan of Cirata Reservoir was 5.7 x 106 m3, but as calculated in 2017 the annual sedimentation rate...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43126 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |