CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA

One of oil and gas company in Indonesia is PT Crowd Energy Indonesia (PT CEI). During production PT CEI transfer crude oil and natural gas using a networks of wells and pumps. For this industry, several challenges is faced to inefficiencies and equipment failures that could happened when well are op...

Full description

Saved in:
Bibliographic Details
Main Author: Gusti Subehi, Rakhman
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/43175
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43175
spelling id-itb.:431752019-09-26T08:24:34ZCRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA Gusti Subehi, Rakhman Manajemen umum Indonesia Theses Loss Production Opportunity, Preventive Maintenance, 5 Whys, Simple Multi Attribute Rating, Analytical Hierarchy Process, Information System INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43175 One of oil and gas company in Indonesia is PT Crowd Energy Indonesia (PT CEI). During production PT CEI transfer crude oil and natural gas using a networks of wells and pumps. For this industry, several challenges is faced to inefficiencies and equipment failures that could happened when well are operated. Loss production opportunity is associated with equipment due to inferior maintenance. Before the issue would be serious major, PT CEI uses maintenance preventive strategy. Preventive maintenance strategy prevents issue of equipment becoming more serious failure and leads to increase in loss production opportunity. In scheduling for inspection, manually download and planning process need to improve. Scheduling process done manually by the planner in determine work order prioritization and spend time 1 – 2 days. Planner spends time and effort to decide work order prioritization. This situation caused lead to certain delays and wasted resources availability. This research using 5 whys analysis to identify the root cause of the problem. From the root cause produce recommendation that recommends to develop an Information System using the Simple Multi Attribute Rating (SMART) method and supported by the Analytical Hierarchy Process (AHP) method in determine weight. Based on this research, the information system successfully provide the score in work order ranking. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Gusti Subehi, Rakhman
CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA
description One of oil and gas company in Indonesia is PT Crowd Energy Indonesia (PT CEI). During production PT CEI transfer crude oil and natural gas using a networks of wells and pumps. For this industry, several challenges is faced to inefficiencies and equipment failures that could happened when well are operated. Loss production opportunity is associated with equipment due to inferior maintenance. Before the issue would be serious major, PT CEI uses maintenance preventive strategy. Preventive maintenance strategy prevents issue of equipment becoming more serious failure and leads to increase in loss production opportunity. In scheduling for inspection, manually download and planning process need to improve. Scheduling process done manually by the planner in determine work order prioritization and spend time 1 – 2 days. Planner spends time and effort to decide work order prioritization. This situation caused lead to certain delays and wasted resources availability. This research using 5 whys analysis to identify the root cause of the problem. From the root cause produce recommendation that recommends to develop an Information System using the Simple Multi Attribute Rating (SMART) method and supported by the Analytical Hierarchy Process (AHP) method in determine weight. Based on this research, the information system successfully provide the score in work order ranking.
format Theses
author Gusti Subehi, Rakhman
author_facet Gusti Subehi, Rakhman
author_sort Gusti Subehi, Rakhman
title CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA
title_short CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA
title_full CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA
title_fullStr CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA
title_full_unstemmed CRITICAL WORK ORDER PRIORITIZATION FOR PREVENTIVE MAINTEANCE AT PT CROWD ENERGY IDONESIA
title_sort critical work order prioritization for preventive mainteance at pt crowd energy idonesia
url https://digilib.itb.ac.id/gdl/view/43175
_version_ 1821998805421129728