THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG

PT Kimia Farma (Persero) Tbk. is a state-owned entreprises (BUMN) in Indonesia that is active in healthcare industry. One of their business lines is pharmaceutical manufacturing. Tablet is one of their highly-requested product to be produced in Bandung plant. Overtime is often needed to fulfill the...

Full description

Saved in:
Bibliographic Details
Main Author: VANDYANI ARDIYANTO, RAHMANISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43182
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43182
spelling id-itb.:431822019-09-26T08:46:14ZTHEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG VANDYANI ARDIYANTO, RAHMANISA Indonesia Final Project flexible flow shop, theory of constraints, makespan. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43182 PT Kimia Farma (Persero) Tbk. is a state-owned entreprises (BUMN) in Indonesia that is active in healthcare industry. One of their business lines is pharmaceutical manufacturing. Tablet is one of their highly-requested product to be produced in Bandung plant. Overtime is often needed to fulfill the demand for tablet. Based on the analysis, this condition happens due to the poor scheduling system because there is no systematic procedure for scheduling the production process. It is indicated by the high number of makespan, low average percentage of machine utilization, and high number of major cleaning needed. Therefore, this research aims to propose a scheduling method that can minimize makespan so that overtime can also be reduced. Production system that is used to produce tablets is a flexible flow shop system with 9 production stages. Each stage has different number of parallel machine. Those parallel machines could have different capacity and specification so that not all machine could be used to manufacture all types of tablet. Method that is used to clean the production machines may vary depend on the sequence of the job, therefore it can be called as a sequence dependent system. Scheduling method that is proposed in this research is a heuristic method named Theory of Constraints (TOC) that has been developed and adjusted with the actual condition. This method is then applied to the company’s demand data for January 2018 and can reduce makespan for manufacturing 61 batches of tablets from 597,86 hours to 568,81 hours so that the overtime needed can be reduced by 3 days. This reduction of makespan also followed by the increased of average machine utilization from 52,88% to 56,80% and the decreased number of major cleaning needed from 168 to 143. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Kimia Farma (Persero) Tbk. is a state-owned entreprises (BUMN) in Indonesia that is active in healthcare industry. One of their business lines is pharmaceutical manufacturing. Tablet is one of their highly-requested product to be produced in Bandung plant. Overtime is often needed to fulfill the demand for tablet. Based on the analysis, this condition happens due to the poor scheduling system because there is no systematic procedure for scheduling the production process. It is indicated by the high number of makespan, low average percentage of machine utilization, and high number of major cleaning needed. Therefore, this research aims to propose a scheduling method that can minimize makespan so that overtime can also be reduced. Production system that is used to produce tablets is a flexible flow shop system with 9 production stages. Each stage has different number of parallel machine. Those parallel machines could have different capacity and specification so that not all machine could be used to manufacture all types of tablet. Method that is used to clean the production machines may vary depend on the sequence of the job, therefore it can be called as a sequence dependent system. Scheduling method that is proposed in this research is a heuristic method named Theory of Constraints (TOC) that has been developed and adjusted with the actual condition. This method is then applied to the company’s demand data for January 2018 and can reduce makespan for manufacturing 61 batches of tablets from 597,86 hours to 568,81 hours so that the overtime needed can be reduced by 3 days. This reduction of makespan also followed by the increased of average machine utilization from 52,88% to 56,80% and the decreased number of major cleaning needed from 168 to 143.
format Final Project
author VANDYANI ARDIYANTO, RAHMANISA
spellingShingle VANDYANI ARDIYANTO, RAHMANISA
THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG
author_facet VANDYANI ARDIYANTO, RAHMANISA
author_sort VANDYANI ARDIYANTO, RAHMANISA
title THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG
title_short THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG
title_full THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG
title_fullStr THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG
title_full_unstemmed THEORY-OF-CONSTRAINTS-BASED HEURISTIC METHOD PROPOSED FOR FLEXIBLE FLOW SHOP SCHEDULING IN PT KIMIA FARMA (PERSERO) TBK PLANT BANDUNG
title_sort theory-of-constraints-based heuristic method proposed for flexible flow shop scheduling in pt kimia farma (persero) tbk plant bandung
url https://digilib.itb.ac.id/gdl/view/43182
_version_ 1821998807301226496