Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance

Metro capsule is one type of transportation based on light rail or light rail transit which is operated automatically. According to the goverment regulation, a railways developer or organizer requires maintenance activities so that the vehicle are allowed to operate. However, the metro capsule does...

Full description

Saved in:
Bibliographic Details
Main Author: Adi Putra Hutabarat, Philips
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43308
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43308
spelling id-itb.:433082019-09-26T14:26:47ZDetermination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance Adi Putra Hutabarat, Philips Indonesia Final Project equipment hierarchy, maintenance, procedure, reliability-centered maintenance INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43308 Metro capsule is one type of transportation based on light rail or light rail transit which is operated automatically. According to the goverment regulation, a railways developer or organizer requires maintenance activities so that the vehicle are allowed to operate. However, the metro capsule does not have a maintenance procedure yet so that the operation will not allowed by the goverment. In addition, metro capsule as a public transportation must ensure the safety and comfort of passengers who use them. The safety and comfort of these passengers depends on the performance of the equipment used in this vehicle. To maintain optimum performance of the equipments, metro capsule operations require maintenance activities. Therefore, this final project was made to plan maintenance activities of metro capsule, especially metro capsule’s structure components. The process of planning the maintenance activities was carried out by using the reliability-centered maintenance (RCM). This process began with creating the equipment hierarchy. The subsystems or sub-subsystems of the hierarchy were applied in the RCM method. Then, the results of RCM method, which is RCM decision worksheets, were used to make maintenance procedures. Format which was applied in procedures is determined based on the needs of metro capsule developer with its contents include the maintenance tasks and its intervals as results of RCM method. The results of this final project are maintenance tasks that were determined by the RCM method and the maintenance procedures which were made based on the maintenance tasks that had been obtained. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Metro capsule is one type of transportation based on light rail or light rail transit which is operated automatically. According to the goverment regulation, a railways developer or organizer requires maintenance activities so that the vehicle are allowed to operate. However, the metro capsule does not have a maintenance procedure yet so that the operation will not allowed by the goverment. In addition, metro capsule as a public transportation must ensure the safety and comfort of passengers who use them. The safety and comfort of these passengers depends on the performance of the equipment used in this vehicle. To maintain optimum performance of the equipments, metro capsule operations require maintenance activities. Therefore, this final project was made to plan maintenance activities of metro capsule, especially metro capsule’s structure components. The process of planning the maintenance activities was carried out by using the reliability-centered maintenance (RCM). This process began with creating the equipment hierarchy. The subsystems or sub-subsystems of the hierarchy were applied in the RCM method. Then, the results of RCM method, which is RCM decision worksheets, were used to make maintenance procedures. Format which was applied in procedures is determined based on the needs of metro capsule developer with its contents include the maintenance tasks and its intervals as results of RCM method. The results of this final project are maintenance tasks that were determined by the RCM method and the maintenance procedures which were made based on the maintenance tasks that had been obtained.
format Final Project
author Adi Putra Hutabarat, Philips
spellingShingle Adi Putra Hutabarat, Philips
Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance
author_facet Adi Putra Hutabarat, Philips
author_sort Adi Putra Hutabarat, Philips
title Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance
title_short Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance
title_full Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance
title_fullStr Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance
title_full_unstemmed Determination and Preparation Maintenance Procedure of Metro Capsule’s Structure based on Reliability-Centered Maintenance
title_sort determination and preparation maintenance procedure of metro capsule’s structure based on reliability-centered maintenance
url https://digilib.itb.ac.id/gdl/view/43308
_version_ 1822926537729507328