OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING

Transportation has a big role to increase a country's productivity which has an impact on social and economic development. One of the popular modes of public transportation is train. There are several stages in the train planning process, one of them is train scheduling. This research will deve...

Full description

Saved in:
Bibliographic Details
Main Author: Nugrata Mangkudilaga, Ervanda
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43419
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43419
spelling id-itb.:434192019-09-27T08:41:34ZOPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING Nugrata Mangkudilaga, Ervanda Indonesia Final Project transportation, optimization, scheduling, trains, MILP. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43419 Transportation has a big role to increase a country's productivity which has an impact on social and economic development. One of the popular modes of public transportation is train. There are several stages in the train planning process, one of them is train scheduling. This research will develop an optimization model of train scheduling and make a proposed schedule with the object of the Jabodetabek Electric Train (KRL) research on the Bogor-Manggarai Route. The purpose of making a more optimal proposed schedule is to reduce the density of passengers on Jabodetabek KRL trips. The main problem that must be resolved is to determine the solution of the conflict that occurs on each train trips. The conflict occurred because there are regulations in train scheduling that are closely related to the safety of train trips. With the implementation of the optimal conflict solution, the average duration of each train trips will be reduced so that the number of train trips can be increased. Increasing the number of train trips will decrease the density of passengers on Jabodetabek KRL trips. The model used as a reference in this study is a model developed by Higgins, Kozan, and Ferreira in 1994. The problem studied is a Mixed Integer Linear Programming (MILP) problem that is solved using the LINGO software. The results of this study are a model that is adjusted for the object of research and a proposed schedule with the addition of 34 trains trips for outbound lines and 45 trains trips for inbound lines. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Transportation has a big role to increase a country's productivity which has an impact on social and economic development. One of the popular modes of public transportation is train. There are several stages in the train planning process, one of them is train scheduling. This research will develop an optimization model of train scheduling and make a proposed schedule with the object of the Jabodetabek Electric Train (KRL) research on the Bogor-Manggarai Route. The purpose of making a more optimal proposed schedule is to reduce the density of passengers on Jabodetabek KRL trips. The main problem that must be resolved is to determine the solution of the conflict that occurs on each train trips. The conflict occurred because there are regulations in train scheduling that are closely related to the safety of train trips. With the implementation of the optimal conflict solution, the average duration of each train trips will be reduced so that the number of train trips can be increased. Increasing the number of train trips will decrease the density of passengers on Jabodetabek KRL trips. The model used as a reference in this study is a model developed by Higgins, Kozan, and Ferreira in 1994. The problem studied is a Mixed Integer Linear Programming (MILP) problem that is solved using the LINGO software. The results of this study are a model that is adjusted for the object of research and a proposed schedule with the addition of 34 trains trips for outbound lines and 45 trains trips for inbound lines.
format Final Project
author Nugrata Mangkudilaga, Ervanda
spellingShingle Nugrata Mangkudilaga, Ervanda
OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING
author_facet Nugrata Mangkudilaga, Ervanda
author_sort Nugrata Mangkudilaga, Ervanda
title OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING
title_short OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING
title_full OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING
title_fullStr OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING
title_full_unstemmed OPTIMIZATION OF JABODETABEK ELECTRIC TRAIN SCHEDULING ON BOGOR-MANGGARAI ROUTE USING MIXED INTEGER LINEAR PROGRAMMING
title_sort optimization of jabodetabek electric train scheduling on bogor-manggarai route using mixed integer linear programming
url https://digilib.itb.ac.id/gdl/view/43419
_version_ 1822926572749848576