Control Planning and Water Gate Design for Mini Hydro Power Plant in Kambangan
The Government of Indonesia targeted the New and Renewable Energy in the total energy mix fraction to reach 23,1% by 2028. The plan was made as an effort to shift from the usage of non-renewable energy to new and renewable energy. One of the manifestations of the plan was the utilization of hydro...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43466 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |