CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA

Urban Escape Waterfront Lifestyle Center is one of among building which can be functioned as shopping and recreation center in Cakung, East Jakarta. This building will be built on the land area of 22.140 m2 with 46.187,09 m2 of total building area. This Final Assignment will provide a discussion abo...

Full description

Saved in:
Bibliographic Details
Main Author: Putra Aprilian, Vicky
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43575
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43575
spelling id-itb.:435752019-09-27T14:02:17ZCONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA Putra Aprilian, Vicky Indonesia Final Project Construction method, work volume, scheduling, construction cost estimation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43575 Urban Escape Waterfront Lifestyle Center is one of among building which can be functioned as shopping and recreation center in Cakung, East Jakarta. This building will be built on the land area of 22.140 m2 with 46.187,09 m2 of total building area. This Final Assignment will provide a discussion about Urban Escape Waterfront Lifestyle Center construction planning. The scope of this final assignment generally will be including the making of project Work Breakdown Structures, construction method planning, work volume calculation, project schedule planning which depends on work productivity, and detailed cost estimation of the project. This project will be divided into 5 major work that is preparation work, soil work, lower structure work, upper structure work, and drainage and water resource work. Project execution will be of Urban Escape Waterfront Lifestyle Center will be finished in 585 working days or 682 days of the calendar, starting on August 5th, 2019 and finish on Juny, 16th 2021. The estimated budget plan of the project is Rp142.732.743.652,-. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Urban Escape Waterfront Lifestyle Center is one of among building which can be functioned as shopping and recreation center in Cakung, East Jakarta. This building will be built on the land area of 22.140 m2 with 46.187,09 m2 of total building area. This Final Assignment will provide a discussion about Urban Escape Waterfront Lifestyle Center construction planning. The scope of this final assignment generally will be including the making of project Work Breakdown Structures, construction method planning, work volume calculation, project schedule planning which depends on work productivity, and detailed cost estimation of the project. This project will be divided into 5 major work that is preparation work, soil work, lower structure work, upper structure work, and drainage and water resource work. Project execution will be of Urban Escape Waterfront Lifestyle Center will be finished in 585 working days or 682 days of the calendar, starting on August 5th, 2019 and finish on Juny, 16th 2021. The estimated budget plan of the project is Rp142.732.743.652,-.
format Final Project
author Putra Aprilian, Vicky
spellingShingle Putra Aprilian, Vicky
CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA
author_facet Putra Aprilian, Vicky
author_sort Putra Aprilian, Vicky
title CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA
title_short CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA
title_full CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA
title_fullStr CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA
title_full_unstemmed CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING OF URBAN ESCAPE WATERFRONT LIFESTYLE CENTER JAKARTA
title_sort construction method, schedule, and cost estimation planning of urban escape waterfront lifestyle center jakarta
url https://digilib.itb.ac.id/gdl/view/43575
_version_ 1822926617831276544