CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)

The alternative that can be done to solve transportation problems in Bandung is development of transportation infrastructure, one of development is Kiaracondong- Buah Batu Overpass. The development of transportation infrastructure will lead to change alternative route at inter-zone movements, so...

Full description

Saved in:
Bibliographic Details
Main Author: Putri Sekar Arumsari, Novita
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43585
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43585
spelling id-itb.:435852019-09-27T14:12:18ZCONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS) Putri Sekar Arumsari, Novita Indonesia Theses traffic modeling, road network performance, overpass. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43585 The alternative that can be done to solve transportation problems in Bandung is development of transportation infrastructure, one of development is Kiaracondong- Buah Batu Overpass. The development of transportation infrastructure will lead to change alternative route at inter-zone movements, so that will affect to performance of the road network, both directly affect and indirectly affect as a result of development, especially for the Kiaracondong - Buah Batu. The Overpass development is not necessarily able to solve the problem or queue length on the road network in Overpass area. Therefore need an analysis to identify alternative configurations and found out the configuration of urban overpass which provide the best traffic performance improvements. Network Database area in this study is Bandung totals 161 zones with 151 internal zones and 10 external zones. The focus of the study and analysis is road network at the Kiaracondong and Buah Batu intersection area. For modeling Bandung road network use the SATURN (Simulation and Assignment Traffic to Urban Road Networks) Software. Conceptually the basic model of SATURN has seven main functions. The first three functions are concentrated on getting traffic flow on the network and four last functions are generally related to network analysis that has been overburdened. Based on the results of network modeling Kiracondong-Buah Batu Overpass, configuration 1 was chosen with a value of 0.259 which was priority 2. Overall development had a positive impact on the performance of the road network. This is indicated by the declining value of V / C ratio. It is not only the road network that has a positive impact, but also aspects of roads, intersection simulations, and costs with BCR indicators. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The alternative that can be done to solve transportation problems in Bandung is development of transportation infrastructure, one of development is Kiaracondong- Buah Batu Overpass. The development of transportation infrastructure will lead to change alternative route at inter-zone movements, so that will affect to performance of the road network, both directly affect and indirectly affect as a result of development, especially for the Kiaracondong - Buah Batu. The Overpass development is not necessarily able to solve the problem or queue length on the road network in Overpass area. Therefore need an analysis to identify alternative configurations and found out the configuration of urban overpass which provide the best traffic performance improvements. Network Database area in this study is Bandung totals 161 zones with 151 internal zones and 10 external zones. The focus of the study and analysis is road network at the Kiaracondong and Buah Batu intersection area. For modeling Bandung road network use the SATURN (Simulation and Assignment Traffic to Urban Road Networks) Software. Conceptually the basic model of SATURN has seven main functions. The first three functions are concentrated on getting traffic flow on the network and four last functions are generally related to network analysis that has been overburdened. Based on the results of network modeling Kiracondong-Buah Batu Overpass, configuration 1 was chosen with a value of 0.259 which was priority 2. Overall development had a positive impact on the performance of the road network. This is indicated by the declining value of V / C ratio. It is not only the road network that has a positive impact, but also aspects of roads, intersection simulations, and costs with BCR indicators.
format Theses
author Putri Sekar Arumsari, Novita
spellingShingle Putri Sekar Arumsari, Novita
CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)
author_facet Putri Sekar Arumsari, Novita
author_sort Putri Sekar Arumsari, Novita
title CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)
title_short CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)
title_full CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)
title_fullStr CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)
title_full_unstemmed CONFIGURATION OPTIMIZATION OF URBAN OVERPASS IN BANDUNG (CASE STUDY: PLAN OF KIARACONDONG-BUAH BATU OVERPASS)
title_sort configuration optimization of urban overpass in bandung (case study: plan of kiaracondong-buah batu overpass)
url https://digilib.itb.ac.id/gdl/view/43585
_version_ 1821998920424751104