THERMOECONOMIC FEASIBILITY STUDY OF MODIFICATION SUBCRITICAL POWER PLANT TO ULTRA-SUPERCRITICAL WITH A CAPACITY OF 660 MW
Ultra-supercritical (USC) technology power plants are widely applied and still being developed in the world. Thermal Efficiency of USC is greater than subcritical (Sub-C) and environmentally friendly. However, the construction of this power plant requires large investment costs because it needs l...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43722 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |