TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL

The tender stage of Geothermal Working Area in Indonesia is conducted after the preliminary survey or preliminary survey and exploration were performed, therefore the available data will be limited. On the other hand, the prospective developer who takes part in the tender must submit the tender’s pr...

Full description

Saved in:
Bibliographic Details
Main Author: Lesmana, Ade
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43866
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43866
spelling id-itb.:438662019-09-30T14:00:54ZTECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL Lesmana, Ade Indonesia Theses Tompaso, numerical modeling, financial modeling, Monte Carlo INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43866 The tender stage of Geothermal Working Area in Indonesia is conducted after the preliminary survey or preliminary survey and exploration were performed, therefore the available data will be limited. On the other hand, the prospective developer who takes part in the tender must submit the tender’s proposal which describes the plan of development strategy and investment cost requirement. Both conditions can be formulated by integrating numerical modeling and financial modeling. These methods are able to accommodate the uncertainty factor to reduce the level of risk that might arise. This study aims to determine the optimum development strategy of the geothermal working area by combining numerical modeling and financial modeling. The output of both methods is a feasibility study of geothermal working area development. As the object of the research, The Tompaso field in North Sulawesi was chosen due to the available data from the publication. The Tompaso field model was built using the TOUGH2 simulator and the output was validated using observation data from 10 wells. The deviation of temperature and pressure of the models against observation data ranges from 4.1-20.2°C and 1.2-18 Bara respectively, so that the model can be stated to have reached the natural state condition. The natural state model was the basis for calculating the proven reserve using dynamic deliverability method and approach of experimental design Box-Behnken 2nd order. The result of 27 simulations generated a proxy equation that was combined with Monter Carlo simulations so that a proven reserve of the Tompaso field is 58.5 MWe (P10). Three development scenarios were selected and simulated to determine the requirement of production, reinjection and make-up wells for each strategy. The economics of each scenario was evaluated using financial modeling with Monte Carlo probabilistic approach. The result obtained was the development of 1 × 40 MWe at the Tompaso field, giving the best IRR probability, which is 13.76% (P10). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The tender stage of Geothermal Working Area in Indonesia is conducted after the preliminary survey or preliminary survey and exploration were performed, therefore the available data will be limited. On the other hand, the prospective developer who takes part in the tender must submit the tender’s proposal which describes the plan of development strategy and investment cost requirement. Both conditions can be formulated by integrating numerical modeling and financial modeling. These methods are able to accommodate the uncertainty factor to reduce the level of risk that might arise. This study aims to determine the optimum development strategy of the geothermal working area by combining numerical modeling and financial modeling. The output of both methods is a feasibility study of geothermal working area development. As the object of the research, The Tompaso field in North Sulawesi was chosen due to the available data from the publication. The Tompaso field model was built using the TOUGH2 simulator and the output was validated using observation data from 10 wells. The deviation of temperature and pressure of the models against observation data ranges from 4.1-20.2°C and 1.2-18 Bara respectively, so that the model can be stated to have reached the natural state condition. The natural state model was the basis for calculating the proven reserve using dynamic deliverability method and approach of experimental design Box-Behnken 2nd order. The result of 27 simulations generated a proxy equation that was combined with Monter Carlo simulations so that a proven reserve of the Tompaso field is 58.5 MWe (P10). Three development scenarios were selected and simulated to determine the requirement of production, reinjection and make-up wells for each strategy. The economics of each scenario was evaluated using financial modeling with Monte Carlo probabilistic approach. The result obtained was the development of 1 × 40 MWe at the Tompaso field, giving the best IRR probability, which is 13.76% (P10).
format Theses
author Lesmana, Ade
spellingShingle Lesmana, Ade
TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL
author_facet Lesmana, Ade
author_sort Lesmana, Ade
title TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL
title_short TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL
title_full TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL
title_fullStr TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL
title_full_unstemmed TECHNO ECONOMY STUDY FOR GEOTHERMAL DEVELOPMENT SCENARIO SELECTION USING NUMERICAL AND FINANCIAL MODEL
title_sort techno economy study for geothermal development scenario selection using numerical and financial model
url https://digilib.itb.ac.id/gdl/view/43866
_version_ 1822926697788342272