BOILER INSPECTION PLANNING CFB THERMAL POWER PLANT BASED ON CONDITION PERFORMANCE OF BOILER CASE STUDY PULANG PISAU THERMAL POWER PLANT ii 2X60 MW

Planning boiler inspections especially for the CFB type power plant currently does not have a standard standard. The advantage of this study is to provide a new alternative to inspection planning with reference to boiler performance conditions. The method is done by collecting boiler performanc...

Full description

Saved in:
Bibliographic Details
Main Author: Subekti Muslim Saputra, Ahmad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/44273
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia