STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB

CIBE (Center Of Infrastructure and Built Environment) is one of four new buildings that are being built by ITB. This final assignment is about planning the construction method of related project. Structure construction method planning has an important role in designing construction projects. The...

Full description

Saved in:
Bibliographic Details
Main Author: Larasati, Masyitha
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/44864
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:44864
spelling id-itb.:448642019-11-12T09:17:21ZSTRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB Larasati, Masyitha Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Construction method, upper structure INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/44864 CIBE (Center Of Infrastructure and Built Environment) is one of four new buildings that are being built by ITB. This final assignment is about planning the construction method of related project. Structure construction method planning has an important role in designing construction projects. The construction method will be a reference for determining the duration and total cost of the project which is described separately, so it takes good planning. Before planning, studying the literature have to be done to understand the basic concepts and theories of construction planning. Planning begins with Work Breakdown Structure (WBS) to know the details of the work, followed by calculating the volume of work, and then devise the method of construction in accordance with the drawings and specifications of the project. Moreover, visibility in determining the schedule and cost estimation is also a reference in deciding the methods, tools, materials and labors for this project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Larasati, Masyitha
STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB
description CIBE (Center Of Infrastructure and Built Environment) is one of four new buildings that are being built by ITB. This final assignment is about planning the construction method of related project. Structure construction method planning has an important role in designing construction projects. The construction method will be a reference for determining the duration and total cost of the project which is described separately, so it takes good planning. Before planning, studying the literature have to be done to understand the basic concepts and theories of construction planning. Planning begins with Work Breakdown Structure (WBS) to know the details of the work, followed by calculating the volume of work, and then devise the method of construction in accordance with the drawings and specifications of the project. Moreover, visibility in determining the schedule and cost estimation is also a reference in deciding the methods, tools, materials and labors for this project.
format Final Project
author Larasati, Masyitha
author_facet Larasati, Masyitha
author_sort Larasati, Masyitha
title STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB
title_short STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB
title_full STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB
title_fullStr STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB
title_full_unstemmed STRUCTURE CONSTRUCTION METHOD PLANNING OF CENTER OF INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB
title_sort structure construction method planning of center of infrastructure and built environment (cibe) itb
url https://digilib.itb.ac.id/gdl/view/44864
_version_ 1822926954842554368