LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)

Indonesia’s transportation infrastructure still pounded with plenty problems that would obstruct national economy expansions and general welfare. Bandung as a city with economic growth above average is a destination for trade and service sector. Thus, insfrastructure transportation’s quality in B...

Full description

Saved in:
Bibliographic Details
Main Author: Bima Arrahman, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/44912
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:44912
spelling id-itb.:449122019-11-13T10:04:01ZLEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION) Bima Arrahman, Muhammad Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Terminal, Bus, Intercity, Capacity, Parking, Circulation, Facility INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/44912 Indonesia’s transportation infrastructure still pounded with plenty problems that would obstruct national economy expansions and general welfare. Bandung as a city with economic growth above average is a destination for trade and service sector. Thus, insfrastructure transportation’s quality in Bandung need to be focus to advance, that is bus terminal as one of the key element. Leuwipanjang terminal as an A level terminal, currently supplies intercity and intracity bus movement. The main cause of high density of vehicle and passanger movement is a limited land owned by terminal, mainly in busy period. As a consequence, service for transportation and pedestrian become victim. Hence, terminal will be designed to respond prior to cases. In addition, parking lots will be determined to knowing need for private parking. Then, evaluation for vehicle and walker circulation will be conluded. For completing the analysis, main and supporting facilities in terminal will be observed. Capacity will be designed to rearrange the headway in departure, plotting for bus lane and adequacy of bus parking lot. Parking will be evaluted to gain characteristic, especially space requirement. Circulation will be evaluated too by identify flow, travel time and cases. Whilst, facility will be checked by interview the terminal officer that verified with observation. Obtained, headway per lane with the scale of 10 minutes until 60 minutes. For parking analysis, with accummulation of 234 vehicles, acquired 2925 m2/day space requirement. Also, attained turnover parking 0,52 vehicle/stall/hour and average duration of 0,51 hour/vehicle. In circulation, obtained layover time amount of 85 minutes for headway 15 minutes and 159 minutes for headway 50 minutes. In facility evaluation, only few facilities fullfil the indicator based on regulation. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Bima Arrahman, Muhammad
LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
description Indonesia’s transportation infrastructure still pounded with plenty problems that would obstruct national economy expansions and general welfare. Bandung as a city with economic growth above average is a destination for trade and service sector. Thus, insfrastructure transportation’s quality in Bandung need to be focus to advance, that is bus terminal as one of the key element. Leuwipanjang terminal as an A level terminal, currently supplies intercity and intracity bus movement. The main cause of high density of vehicle and passanger movement is a limited land owned by terminal, mainly in busy period. As a consequence, service for transportation and pedestrian become victim. Hence, terminal will be designed to respond prior to cases. In addition, parking lots will be determined to knowing need for private parking. Then, evaluation for vehicle and walker circulation will be conluded. For completing the analysis, main and supporting facilities in terminal will be observed. Capacity will be designed to rearrange the headway in departure, plotting for bus lane and adequacy of bus parking lot. Parking will be evaluted to gain characteristic, especially space requirement. Circulation will be evaluated too by identify flow, travel time and cases. Whilst, facility will be checked by interview the terminal officer that verified with observation. Obtained, headway per lane with the scale of 10 minutes until 60 minutes. For parking analysis, with accummulation of 234 vehicles, acquired 2925 m2/day space requirement. Also, attained turnover parking 0,52 vehicle/stall/hour and average duration of 0,51 hour/vehicle. In circulation, obtained layover time amount of 85 minutes for headway 15 minutes and 159 minutes for headway 50 minutes. In facility evaluation, only few facilities fullfil the indicator based on regulation.
format Final Project
author Bima Arrahman, Muhammad
author_facet Bima Arrahman, Muhammad
author_sort Bima Arrahman, Muhammad
title LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
title_short LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
title_full LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
title_fullStr LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
title_full_unstemmed LEUWIPANJANG TERMINAL BUS DESIGN (CASE STUDY: INTERCITY TRANSPORTATION)
title_sort leuwipanjang terminal bus design (case study: intercity transportation)
url https://digilib.itb.ac.id/gdl/view/44912
_version_ 1821999235000696832