RESCHEDULING RAILWAY TIMETABLES FROM AUTOMATED GUIDEWAY TRANSIT IN AIRPORT USING MAX PLUS â MODEL PREDICTIVE CONTROL METHODS
Rescheduling Railway timetable is one of the effort to minimize propagation delay time caused by the tardiness on departure time of railway. The tardiness of departure time without the increasment of speed to recover the delayed effect on the next cycle as a continuation act often leads to an accumu...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/44941 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |