Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application
Reservoir modeling and characterization are the key factor during the decision making process in a field development project. Capacitance-Resistance Model (CRM) is a tool that has been developed to carry out a quick reservoir behavior modeling which only requires bottom hole pressure data and liquid...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/45196 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:45196 |
---|---|
spelling |
id-itb.:451962019-11-27T09:31:03ZEvaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application Abymanew, Andrey Pertambangan dan operasi berkaitan Indonesia Final Project Capacitance-resistance model, pattern realigment, waterflood, inter-well connectivity, production response delay INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/45196 Reservoir modeling and characterization are the key factor during the decision making process in a field development project. Capacitance-Resistance Model (CRM) is a tool that has been developed to carry out a quick reservoir behavior modeling which only requires bottom hole pressure data and liquid rate. This study aims to evaluate CRM parameters in a waterflooded field originally with inverted five spot injection pattern. The field that is evaluated is a synthetic field generated using IMEX-CMG software. Parameters evaluation is done before and after the injection pattern realignment takes place. The right pattern realignment is sought to maximize the cumulative oil production. CRM Injector-Producer (CRMIP) is chosen as the control volume to characterize the reservoir behavior because CRMIP consider the affected pore volume of any pair of injector-producer. The relationship of every well is shown by inter-well connectivity and production response delay, modeling result using CRM method is then evaluated to observe the oil fraction of the total liquid production. The evaluation result indicates that CRM parameters show an alteration before and after the realignment process. This study hopefully can aid in performing quick reservoir modeling in the future text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Pertambangan dan operasi berkaitan |
spellingShingle |
Pertambangan dan operasi berkaitan Abymanew, Andrey Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application |
description |
Reservoir modeling and characterization are the key factor during the decision making process in a field development project. Capacitance-Resistance Model (CRM) is a tool that has been developed to carry out a quick reservoir behavior modeling which only requires bottom hole pressure data and liquid rate. This study aims to evaluate CRM parameters in a waterflooded field originally with inverted five spot injection pattern. The field that is evaluated is a synthetic field generated using IMEX-CMG software. Parameters evaluation is done before and after the injection pattern realignment takes place. The right pattern realignment is sought to maximize the cumulative oil production.
CRM Injector-Producer (CRMIP) is chosen as the control volume to characterize the reservoir behavior because CRMIP consider the affected pore volume of any pair of injector-producer. The relationship of every well is shown by inter-well connectivity and production response delay, modeling result using CRM method is then evaluated to observe the oil fraction of the total liquid production. The evaluation result indicates that CRM parameters show an alteration before and after the realignment process. This study hopefully can aid in performing quick reservoir modeling in the future |
format |
Final Project |
author |
Abymanew, Andrey |
author_facet |
Abymanew, Andrey |
author_sort |
Abymanew, Andrey |
title |
Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application |
title_short |
Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application |
title_full |
Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application |
title_fullStr |
Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application |
title_full_unstemmed |
Evaluation of Capacitance Model Parameters With Pattern Realignment In a Waterflood Application |
title_sort |
evaluation of capacitance model parameters with pattern realignment in a waterflood application |
url |
https://digilib.itb.ac.id/gdl/view/45196 |
_version_ |
1822270832782606336 |