GOVERNANCE PROBLEMS MAPPING ON THE PUBLICPRIVATE PARTNERSHIP PROJECT OF JATILUHUR REGIONAL WATER SUPPLY PHASE I
Indonesian Government is intensively implementing Public-Private Partnership as an infrastructure financing alternative. Access to water services is the main target of national development with the highest target of achievement in 2019, which is targeted to reach 100%. To achieve this target, the...
Saved in:
Main Author: | Yahya, Wisely |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/45898 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COLLABORATION PROBLEMS ON THE PUBLIC PRIVATE PARTNERSHIP PROJECT OF UMBULAN DRINKING WATER SUPPLY SYSTEM
by: Kusumastuti, Galuh -
OPTIMIZATION OF WATER ALLOCATION IN RESERVOIR; JATILUHUR RESERVOIR CASE
by: PRIMA (NIM : 10108005); Pembimbing I :Prof. Dr. Edy Soewono; Pembimbing I : Muhammad Isla, SARASWATI -
PERANCANGAN LAKE RESORT WADUK JATILUHUR
by: MARCHELINO, ADRIAN -
Disaster governance and prospects of inter-regional partnership in the Asia-Pacific
by: Cook, Alistair David Blair, et al.
Published: (2021) -
IDENTIFYING THE IMPACT OF THE EL NIñO CLIMATE ANOMALY ON WATER AVAILABILITY AND RELIABILITY OF WATER SUPPLY IN THE WEST TARUM CANAL OF THE JATILUHUR RESERVOIR.
by: Dahlia, Lia