PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03

Transportation is the important thing related to the economic growth of a region. As developed society grow, then the movement of goods and services will also be increased which then must be balanced by increasing transportation facilities and infrastructure, for example the addition of road network...

Full description

Saved in:
Bibliographic Details
Main Author: Widya Kartini, Ariningtiyas
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/45999
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:45999
spelling id-itb.:459992020-02-06T14:46:10ZPRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03 Widya Kartini, Ariningtiyas Teknik sipil Indonesia Final Project design, geometric, drainage, pavement, signs. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/45999 Transportation is the important thing related to the economic growth of a region. As developed society grow, then the movement of goods and services will also be increased which then must be balanced by increasing transportation facilities and infrastructure, for example the addition of road network. The addition of the road network should be based on good planning which consists of several important elements design such as geometric, drainage, pavement, as well as complementary facilities such as signs and road markings. In addition, the estimated cost of work needed and visualization of the planning result through design drawings. The road designed as primary collector road with two lanes and two way undivided (2/2 UD) with the classification of mountainous terrain and has a length of 5428.03 m. The Road is designed with 9 curvatures and 16 vertical curves. Drainage ditches designed rectangular shaped with dimensions of 0.3 x 0.6 m. In this final project, there are 9 culverts rectangular shaped with dimension of 0.6 x 0.6 m. The structure of the pavement that used is flexible pavement structures. Road pavement material including a surface layer of material with a thickness of 20 cm Laston. Aggregate class A as base course material has a thickness of 15 cm. Aggregate class B as subbase course material has a thickness of 16 cm. Total signs that used are 88 signs. Markers used are markers longitudinal solid line and a dotted line. Estimated costs of road work that is designed is Rp 88.623.185.306,65. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Widya Kartini, Ariningtiyas
PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03
description Transportation is the important thing related to the economic growth of a region. As developed society grow, then the movement of goods and services will also be increased which then must be balanced by increasing transportation facilities and infrastructure, for example the addition of road network. The addition of the road network should be based on good planning which consists of several important elements design such as geometric, drainage, pavement, as well as complementary facilities such as signs and road markings. In addition, the estimated cost of work needed and visualization of the planning result through design drawings. The road designed as primary collector road with two lanes and two way undivided (2/2 UD) with the classification of mountainous terrain and has a length of 5428.03 m. The Road is designed with 9 curvatures and 16 vertical curves. Drainage ditches designed rectangular shaped with dimensions of 0.3 x 0.6 m. In this final project, there are 9 culverts rectangular shaped with dimension of 0.6 x 0.6 m. The structure of the pavement that used is flexible pavement structures. Road pavement material including a surface layer of material with a thickness of 20 cm Laston. Aggregate class A as base course material has a thickness of 15 cm. Aggregate class B as subbase course material has a thickness of 16 cm. Total signs that used are 88 signs. Markers used are markers longitudinal solid line and a dotted line. Estimated costs of road work that is designed is Rp 88.623.185.306,65.
format Final Project
author Widya Kartini, Ariningtiyas
author_facet Widya Kartini, Ariningtiyas
author_sort Widya Kartini, Ariningtiyas
title PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03
title_short PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03
title_full PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03
title_fullStr PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03
title_full_unstemmed PRIMARY COLLECTOR ROAD DESIGN JAYAPURA – SENTANI AIRPORT SEGMENT 4 STA 0+000 – STA 5+428,03
title_sort primary collector road design jayapura – sentani airport segment 4 sta 0+000 – sta 5+428,03
url https://digilib.itb.ac.id/gdl/view/45999
_version_ 1822271065864273920