RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL

PT Badak NGL’s ERP (Enterprise Resource Planning) system is currently facing obsolescence issues both IBM infrastructures and Oracle ERP version. Oracle ERP addresses major activities such as Maintenance, Procurements, Human Resources, and Financial. Therefore PT Badak NGL prepares to launch an Orac...

Full description

Saved in:
Bibliographic Details
Main Author: Wijaya Perwira, Pandu
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/46390
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:46390
spelling id-itb.:463902020-03-04T09:53:00ZRISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL Wijaya Perwira, Pandu Manajemen umum Indonesia Theses PMBOK, ISM (Interpretive Structural Modeling), ERP (Enterprise Resource Planning), ERP Risk Management INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/46390 PT Badak NGL’s ERP (Enterprise Resource Planning) system is currently facing obsolescence issues both IBM infrastructures and Oracle ERP version. Oracle ERP addresses major activities such as Maintenance, Procurements, Human Resources, and Financial. Therefore PT Badak NGL prepares to launch an Oracle ERP Upgrade Project in order to sustain its Oracle ERP and Plant Operation excellence. However based on two previous ERP projects that were suffered delay and cost overruns, and the ERP Upgrade project most likely no exception. One of the facts found that there is no risk mitigation or contingency plan being implemented, hence in this ERP Upgrade project the risk response and plan is going to be employed. The PMBOK Risk Management, ATOM and ERP Risk Management are the methodologies that being used to carried out risk assessment. Risks were identified by combining IT, ERP risk and lesson learned factors. Next these risks are evaluated by using Risk Matrix to get the high-risk type in terms of probability and size of impact. Ten risks that were drawn out are analyzed further by using Interpretive Structural Modeling (ISM) to identify the risk snowball effects. It was identified that Capability & Performance of Infrastructure was the most influencing factor that causes the snowball effect. Hence the solution to response such risk is by preparing collaboration activity that involves the ERP hardware and software vendor, existing system assessment, proof of concept (POC) in order to build a comprehensive solution and to prevent miscommunication and overlooked assumptions. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Wijaya Perwira, Pandu
RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
description PT Badak NGL’s ERP (Enterprise Resource Planning) system is currently facing obsolescence issues both IBM infrastructures and Oracle ERP version. Oracle ERP addresses major activities such as Maintenance, Procurements, Human Resources, and Financial. Therefore PT Badak NGL prepares to launch an Oracle ERP Upgrade Project in order to sustain its Oracle ERP and Plant Operation excellence. However based on two previous ERP projects that were suffered delay and cost overruns, and the ERP Upgrade project most likely no exception. One of the facts found that there is no risk mitigation or contingency plan being implemented, hence in this ERP Upgrade project the risk response and plan is going to be employed. The PMBOK Risk Management, ATOM and ERP Risk Management are the methodologies that being used to carried out risk assessment. Risks were identified by combining IT, ERP risk and lesson learned factors. Next these risks are evaluated by using Risk Matrix to get the high-risk type in terms of probability and size of impact. Ten risks that were drawn out are analyzed further by using Interpretive Structural Modeling (ISM) to identify the risk snowball effects. It was identified that Capability & Performance of Infrastructure was the most influencing factor that causes the snowball effect. Hence the solution to response such risk is by preparing collaboration activity that involves the ERP hardware and software vendor, existing system assessment, proof of concept (POC) in order to build a comprehensive solution and to prevent miscommunication and overlooked assumptions.
format Theses
author Wijaya Perwira, Pandu
author_facet Wijaya Perwira, Pandu
author_sort Wijaya Perwira, Pandu
title RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
title_short RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
title_full RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
title_fullStr RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
title_full_unstemmed RISK ASSESSMENT PROJECT CASE STUDY ERP UPGRADE AT PT BADAK NGL
title_sort risk assessment project case study erp upgrade at pt badak ngl
url https://digilib.itb.ac.id/gdl/view/46390
_version_ 1821999586646949888