BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY

In the growing economy of Indonesia, encouraging property business to grow as well. Particularly in office space providers, many lands in Jakarta area are built into Office Buildings, either in the heart of Jakarta or the skirt of Jakarta. The supply becomes enormous with each category, Grade A, Gra...

Full description

Saved in:
Bibliographic Details
Main Author: Ariyanto, Stephanie
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/46620
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:46620
spelling id-itb.:466202020-03-09T15:20:36ZBUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY Ariyanto, Stephanie Indonesia Theses Grade A office Building, Scenario Planning, Market Trend, Political Direction INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/46620 In the growing economy of Indonesia, encouraging property business to grow as well. Particularly in office space providers, many lands in Jakarta area are built into Office Buildings, either in the heart of Jakarta or the skirt of Jakarta. The supply becomes enormous with each category, Grade A, Grade B, Grade C, and Grade Premium for outstanding buildings. PT Windas Development develops a Class A office building in the heart of Jakarta area, named Daswin Office Tower. The general business issue is faced by the company is the uncertainty of market conditions for Daswin Office Tower. From the analysis, political is the most mentioned driver in this issue. The second highest driver is the dominant industry in the market with their buying power. The scenario planning will be referred to Government Policy Direction and Trend of Dominant Industry Tenant as indicators. To implement the analysis and prepare the scenario planning, PT Windas Development should set 3 (three) teams to analyze the internal condition and monitor the external condition. Technical team will analyze the building specification and planning the adjustment, completed by price estimation. Internal Business Development will prepare alternative business schemes to respond the uncertainty scenarios. External marketing will update the market condition and significant tenants movement in the market. To prepare any scenario coming after the building operation is running, temporary outsource technical team is needed, to re-valuation the building and current price at the time to update the adjustment planning and price estimation. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In the growing economy of Indonesia, encouraging property business to grow as well. Particularly in office space providers, many lands in Jakarta area are built into Office Buildings, either in the heart of Jakarta or the skirt of Jakarta. The supply becomes enormous with each category, Grade A, Grade B, Grade C, and Grade Premium for outstanding buildings. PT Windas Development develops a Class A office building in the heart of Jakarta area, named Daswin Office Tower. The general business issue is faced by the company is the uncertainty of market conditions for Daswin Office Tower. From the analysis, political is the most mentioned driver in this issue. The second highest driver is the dominant industry in the market with their buying power. The scenario planning will be referred to Government Policy Direction and Trend of Dominant Industry Tenant as indicators. To implement the analysis and prepare the scenario planning, PT Windas Development should set 3 (three) teams to analyze the internal condition and monitor the external condition. Technical team will analyze the building specification and planning the adjustment, completed by price estimation. Internal Business Development will prepare alternative business schemes to respond the uncertainty scenarios. External marketing will update the market condition and significant tenants movement in the market. To prepare any scenario coming after the building operation is running, temporary outsource technical team is needed, to re-valuation the building and current price at the time to update the adjustment planning and price estimation.
format Theses
author Ariyanto, Stephanie
spellingShingle Ariyanto, Stephanie
BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY
author_facet Ariyanto, Stephanie
author_sort Ariyanto, Stephanie
title BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY
title_short BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY
title_full BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY
title_fullStr BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY
title_full_unstemmed BUSINESS STRATEGY FOR DASWIN OFFICE TOWER - GRADE “A” OFFICE BUILDING IN FACING UNCERTAINTY
title_sort business strategy for daswin office tower - grade “a” office building in facing uncertainty
url https://digilib.itb.ac.id/gdl/view/46620
_version_ 1821999652592943104