PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN
Flood occurs in Cibinuangeun river every year and big overflow happens every five years. This is caused by the incapability of the river body to contain the rainfall. The watershed which consists of rice fields, plantation, forest, and habitation of civils caused the surface flow to increase. The fl...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46843 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:46843 |
---|---|
spelling |
id-itb.:468432020-03-12T14:43:04ZPLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN Fatima Kusuma Dias, Maria Indonesia Final Project Flood, Cibinuangeun River, HEC-RAS 5.7, Bypass Cannal, Levee INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/46843 Flood occurs in Cibinuangeun river every year and big overflow happens every five years. This is caused by the incapability of the river body to contain the rainfall. The watershed which consists of rice fields, plantation, forest, and habitation of civils caused the surface flow to increase. The flood which occurs in Cibinuangeun’s irrigation area results in failure of harvesting of the 2000-hectare paddy fields along the left and right side of the river. This flood control planning along the Cibinuangeun river segment takes source from Cibereum rain station for the Hydrological analysis which inflicts flood discharge of 196 m3/s by Snyder method of repetitive period time of 25 years. The flood water level along the river is analyzed by HEC-RAS 5.7 software in order to derive structural solution of this flood control planning, which is the construction of canal bypass and levee. Bypass canal is designed in shape of trapezium with five meter in height and 2800 meters in length towards the beach. Levee is built along the river study location with 3.6 meters height and a total length of 2500 meters of the river’s right and left side. Bypass canal reduces the flood discharge in the main river by 70%, whilst the levee increases the capacity of river with the result of flood water level no longer being above the river level. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Flood occurs in Cibinuangeun river every year and big overflow happens every five years. This is caused by the incapability of the river body to contain the rainfall. The watershed which consists of rice fields, plantation, forest, and habitation of civils caused the surface flow to increase. The flood which occurs in Cibinuangeun’s irrigation area results in failure of harvesting of the 2000-hectare paddy fields along the left and right side of the river. This flood control planning along the Cibinuangeun river segment takes source from Cibereum rain station for the Hydrological analysis which inflicts flood discharge of 196 m3/s by Snyder method of repetitive period time of 25 years. The flood water level along the river is analyzed by HEC-RAS 5.7 software in order to derive structural solution of this flood control planning, which is the construction of canal bypass and levee. Bypass canal is designed in shape of trapezium with five meter in height and 2800 meters in length towards the beach. Levee is built along the river study location with 3.6 meters height and a total length of 2500 meters of the river’s right and left side. Bypass canal reduces the flood discharge in the main river by 70%, whilst the levee increases the capacity of river with the result of flood water level no longer being above the river level.
|
format |
Final Project |
author |
Fatima Kusuma Dias, Maria |
spellingShingle |
Fatima Kusuma Dias, Maria PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN |
author_facet |
Fatima Kusuma Dias, Maria |
author_sort |
Fatima Kusuma Dias, Maria |
title |
PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN |
title_short |
PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN |
title_full |
PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN |
title_fullStr |
PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN |
title_full_unstemmed |
PLANNING OF BYPASS CANAL AND LEVEE FOR FLOOD CONTROL IN IRRIGATION AREA OF CIBINUANGEUN, BANTEN |
title_sort |
planning of bypass canal and levee for flood control in irrigation area of cibinuangeun, banten |
url |
https://digilib.itb.ac.id/gdl/view/46843 |
_version_ |
1822927492409720832 |