REVERSE LOGISTICS USING DEVELOPMENT OF EOQ-REVERSE AND EPQ MULTI PRODUCT METHODS ON THE STEEL PRODUCTION FLOOR
Material procurement in this research is carried out by the EOQ-reverse method, while the production process is managed by a multi product EPQ model, where in the production process of a product there will generally be several types of products produced. The purpose of this research is to obtain the...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/47207 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |