FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE

Surakata Great Mosque is a 5-story building with 3-story basement used for parking area located in Surakarta. The design of foundation must meet the design criterias which are load-carrying capacity and settlement. The type of foundation used is bored-pile foundation with the depth of 21 meters and...

Full description

Saved in:
Bibliographic Details
Main Author: Arya Faviandhana, Reyhan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/47220
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:47220
spelling id-itb.:472202020-03-16T15:58:59ZFOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE Arya Faviandhana, Reyhan Indonesia Final Project bored pile foundation, diapraghm wall, ground anchor INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/47220 Surakata Great Mosque is a 5-story building with 3-story basement used for parking area located in Surakarta. The design of foundation must meet the design criterias which are load-carrying capacity and settlement. The type of foundation used is bored-pile foundation with the depth of 21 meters and the diameter of 1 meters. The single pile axial bearing capacity was determined by manual calculation using Meyerhof method, the single pile lateral bearing capacity was determined using LPILE, and the group pile axial bearing capacity was determined using GROUP alongside manual calculation using paku keling method. On the other hand, the analysis of group pile elastic settlement was done by manual calculation using Vesic method while the analysis of group pile consolidation settlement was done by using 2:1 stress distribution method. The analyses altogether resulted in seven group pile configurations and a total of 260 piles. Deep excavation design for the need of basement area of Surakarta Great Mosque with the depth of 9 meters is supported by diapraghm wall system and ground anchors. The analysis is done in PLAXIS2D with hardening soil model material. The depth of penetration is 20 meters and the thickness is 0,6 meters. Deep excavation is divided into three construction stages with 4 meters excavation for the first two step and 1 meters excavation for the last one. Dewatering to lower ground water level to 1 meter below excavation base. Three ground anchors are installed at the elevation of -3,5 meters and -7,5 meters with prestressed force assigned after each stage of excavation. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Surakata Great Mosque is a 5-story building with 3-story basement used for parking area located in Surakarta. The design of foundation must meet the design criterias which are load-carrying capacity and settlement. The type of foundation used is bored-pile foundation with the depth of 21 meters and the diameter of 1 meters. The single pile axial bearing capacity was determined by manual calculation using Meyerhof method, the single pile lateral bearing capacity was determined using LPILE, and the group pile axial bearing capacity was determined using GROUP alongside manual calculation using paku keling method. On the other hand, the analysis of group pile elastic settlement was done by manual calculation using Vesic method while the analysis of group pile consolidation settlement was done by using 2:1 stress distribution method. The analyses altogether resulted in seven group pile configurations and a total of 260 piles. Deep excavation design for the need of basement area of Surakarta Great Mosque with the depth of 9 meters is supported by diapraghm wall system and ground anchors. The analysis is done in PLAXIS2D with hardening soil model material. The depth of penetration is 20 meters and the thickness is 0,6 meters. Deep excavation is divided into three construction stages with 4 meters excavation for the first two step and 1 meters excavation for the last one. Dewatering to lower ground water level to 1 meter below excavation base. Three ground anchors are installed at the elevation of -3,5 meters and -7,5 meters with prestressed force assigned after each stage of excavation.
format Final Project
author Arya Faviandhana, Reyhan
spellingShingle Arya Faviandhana, Reyhan
FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE
author_facet Arya Faviandhana, Reyhan
author_sort Arya Faviandhana, Reyhan
title FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE
title_short FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE
title_full FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE
title_fullStr FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE
title_full_unstemmed FOUNDATION AND DEEP EXCAVATION DESIGN SURAKATA GREAT MOSQUE
title_sort foundation and deep excavation design surakata great mosque
url https://digilib.itb.ac.id/gdl/view/47220
_version_ 1822927608990400512