CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA

Surakarta is one of Indonesia’s big cities with relatively high of population density, comapred to other cities in West Java with most of the population is moslem. This Final Project reviewed the construction management aspects of Great Mosque of Surakarta as one of the solutions for this condition....

Full description

Saved in:
Bibliographic Details
Main Author: Edwin Pambudi, Vincentius
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/47223
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:47223
spelling id-itb.:472232020-03-16T16:01:53ZCONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA Edwin Pambudi, Vincentius Indonesia Final Project Cost Construction Estimation, Construction Methods, S Curve, Great Mosque of Surakarta. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/47223 Surakarta is one of Indonesia’s big cities with relatively high of population density, comapred to other cities in West Java with most of the population is moslem. This Final Project reviewed the construction management aspects of Great Mosque of Surakarta as one of the solutions for this condition. The scope of this Final Project generally involves the creation of Work Breakdown Structures, planning of construction methods which include site plan and zoning, work volume calculations, scheduling based on productivity, and detailed cost estimation for preparatory work, ground work, lower structure work, upper structure work and water resource management work. The determination of duration of work is done based on two factors that are based on the heavy equipment leads and the labor resources leads. Detailed cost estimation were made using two methods: unit price using SNI and Permen PU no. 28 2016 and resource enumeration. This project is scheduled to be constructed for a total duration of 426 days or 1 year and 2 months. The project cost budget plan is Rp 96.975.063.723,52 with a percentage of cost for the preparatory work of 1,35%, ground work 2,786%, lower structure work 17,252%, structural work 53,084% and water resource management 0,0697%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Surakarta is one of Indonesia’s big cities with relatively high of population density, comapred to other cities in West Java with most of the population is moslem. This Final Project reviewed the construction management aspects of Great Mosque of Surakarta as one of the solutions for this condition. The scope of this Final Project generally involves the creation of Work Breakdown Structures, planning of construction methods which include site plan and zoning, work volume calculations, scheduling based on productivity, and detailed cost estimation for preparatory work, ground work, lower structure work, upper structure work and water resource management work. The determination of duration of work is done based on two factors that are based on the heavy equipment leads and the labor resources leads. Detailed cost estimation were made using two methods: unit price using SNI and Permen PU no. 28 2016 and resource enumeration. This project is scheduled to be constructed for a total duration of 426 days or 1 year and 2 months. The project cost budget plan is Rp 96.975.063.723,52 with a percentage of cost for the preparatory work of 1,35%, ground work 2,786%, lower structure work 17,252%, structural work 53,084% and water resource management 0,0697%.
format Final Project
author Edwin Pambudi, Vincentius
spellingShingle Edwin Pambudi, Vincentius
CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA
author_facet Edwin Pambudi, Vincentius
author_sort Edwin Pambudi, Vincentius
title CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA
title_short CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA
title_full CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA
title_fullStr CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA
title_full_unstemmed CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF GREAT MOSQUE OF SURAKARTA
title_sort construction management aspects planning of great mosque of surakarta
url https://digilib.itb.ac.id/gdl/view/47223
_version_ 1822927609966624768