INVESTMENT OPTIMIZATION FOR GOLD VEIN MINING WITH OPTIONAL CUT-OFF-GRADE AND FUZZY REAL OPTION METHODS : CASE STUDY OF VEIN KUBANG CICAU PT ANTAM TBK PONGKOR
PT Antam, Tbk UBPE Pongkor vein Kubang Cicau B will end at the level of 475 masl. This is because, PT Antam, Tbk UBPE Pongkor is currently mining below the level of the Cikaniki river which is at the level of 500 masl. Pongkor mining has a great risk and has the potential to harm the company if i...
Saved in:
Main Author: | Sibarani, Sariuly |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/47279 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF HEAT DISTRIBUTION ON VENTILATION NETWORK IN RAMP DOWN 450 KUBANG CICAU MINE UBPE ANTAM PONGKOR
by: YULIANTI (NIM : 22115016), RIRIN -
CHARACTERISTIC OF GOLD MINERALISATION BASED ON VEIN TEXTURE OF QUARTZ AND GRADE ORE IN VEIN PKR-02, MOUNT PONGKOR, BOGOR, WEST JAVA
by: Adiyasari, Mutiara -
STOPE GEOMETRY OPTIMIZATION IN VEIN DEPOSIT USING HEURISTIC ALGORITHM WHICH CONSIDERED GEOMECHANICAL PARAMETERS (CASE STUDY: UBPE ANTAM PONGKOR)
by: Putra, Danu -
SUPERGEN GOLD-SILVER ENRICHMENT MODEL AT VEIN TYPE EPITHERMAL PONGKOR DEPOSITS, WEST JAYA
by: GIRMAY NEGA, DAGNEW -
ANALISIS KESTABILAN TEROWONGAN TERHADAP PENGARUH VARIASI BEBAN GEMPA MENGGUNAKAN METODE ELEMEN HINGGA PADA TEROWONGAN KUBANG CICAU DI GUNUNG PONGKOR, KABUPATEN BOGOR, JAWA BARAT
by: Cahya Nusantara Herdianto, Tedi