ANALISIS PERKEMBANGAN KINERJA JALAN CIBADAK-PELABUHANRATU KABUPATEN SUKABUMI

The rapid growth of economic activity in Sukabumi has implications for the increased need for transportation movements which has caused congestion problems. The efforts made by the government to overcome these problems are by building the BOCIMI Toll Road and Cikembar Airport so that the accessibili...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Zulfikar, Marsa
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/47322
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:The rapid growth of economic activity in Sukabumi has implications for the increased need for transportation movements which has caused congestion problems. The efforts made by the government to overcome these problems are by building the BOCIMI Toll Road and Cikembar Airport so that the accessibility of Sukabumi Regency is increasing and the development of the region can run smoothly. The development of the performance of the Cibadak-Pelabuhanratu Road as a link between one of the BOCIMI Toll Road gates and the Cikembar Airport so that there is no shortage in the provision of transportation infrastructure in the future. To find out the performance of the Cibadak-Pelabuhanratu Road, the Volume Capacity Ratio and the level of service are used as indicators of road performance. VCR is the result of the division between traffic volume and road capacity, so the data that needs to be used in VCR calculation is the capacity of the Cibadak-Pelabuhanratu Road and its traffic volume. Whereas the LOS of Cibadak-Pelabuhanratu Road can be determined based on the VCR value of the road.