DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG
The increasing of Bandung Citizens is also increasing the needs of residentials area. But, it can not be fulfilled given that we have limited lands available to use. In order to solve this problem, the government planned to build Simple Rent House (Rusunawa) Cingised II located in Arcamanik, Band...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/47343 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:47343 |
---|---|
spelling |
id-itb.:473432020-04-04T22:50:58ZDESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG Rizaldi Perkasa, Muhammad Teknik sipil Indonesia Final Project Residential Area, Rusunawa Cingised II, Bore Pile Foundation, Diaphragm Wall INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/47343 The increasing of Bandung Citizens is also increasing the needs of residentials area. But, it can not be fulfilled given that we have limited lands available to use. In order to solve this problem, the government planned to build Simple Rent House (Rusunawa) Cingised II located in Arcamanik, Bandung City. Rusunawa Cisinged II is a 12 (twelve) stories building with 2 (two) basement, and 1 (one) rooftop. This final project is objected to design foundation system and retaining wall of the building. This building is using bored pile foundation to adapt with the given soil condition. The design of foundation is objected to obtain size and material’s configuration that fit to bear structural loads so that the foundation is able to fulfill the deflection and settlement’s requirement. Results of this design process are 6 (six) variation of pile group with 0,6 metres and 0,8 metres bore pile’s diameter. Those are P1, P2, P3, P4, P5, and P6. The analysis of the foundation is done by utilizing Lpile, Group 8, and PCAcol. Retaining wall will be used as basement construction of the building. The retaining wall’s type that used is diaphragm wall. As the result, the building requires 11 (eleven) metre high and 0,6 metre width of retaining wall using 35 MPa of concrete to bear 7 (seven) metre depth of basement. Written on the designing guidelines that whe diaphragm wall has 1,65 of safety factor’s value and 11,57 mm of deflection required. The analysis of retaining wall is done by utilizing PLAXIS 2D. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik sipil |
spellingShingle |
Teknik sipil Rizaldi Perkasa, Muhammad DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG |
description |
The increasing of Bandung Citizens is also increasing the needs of residentials area.
But, it can not be fulfilled given that we have limited lands available to use. In order
to solve this problem, the government planned to build Simple Rent House
(Rusunawa) Cingised II located in Arcamanik, Bandung City. Rusunawa Cisinged
II is a 12 (twelve) stories building with 2 (two) basement, and 1 (one) rooftop. This
final project is objected to design foundation system and retaining wall of the
building. This building is using bored pile foundation to adapt with the given soil
condition.
The design of foundation is objected to obtain size and material’s configuration that
fit to bear structural loads so that the foundation is able to fulfill the deflection and
settlement’s requirement. Results of this design process are 6 (six) variation of pile
group with 0,6 metres and 0,8 metres bore pile’s diameter. Those are P1, P2, P3,
P4, P5, and P6. The analysis of the foundation is done by utilizing Lpile, Group 8,
and PCAcol.
Retaining wall will be used as basement construction of the building. The retaining
wall’s type that used is diaphragm wall. As the result, the building requires 11
(eleven) metre high and 0,6 metre width of retaining wall using 35 MPa of concrete
to bear 7 (seven) metre depth of basement. Written on the designing guidelines that
whe diaphragm wall has 1,65 of safety factor’s value and 11,57 mm of deflection
required. The analysis of retaining wall is done by utilizing PLAXIS 2D. |
format |
Final Project |
author |
Rizaldi Perkasa, Muhammad |
author_facet |
Rizaldi Perkasa, Muhammad |
author_sort |
Rizaldi Perkasa, Muhammad |
title |
DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG |
title_short |
DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG |
title_full |
DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG |
title_fullStr |
DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG |
title_full_unstemmed |
DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG |
title_sort |
design of foundation system and retaining wall structure for basement construction of rusunawa cingised ii bandung |
url |
https://digilib.itb.ac.id/gdl/view/47343 |
_version_ |
1821999854053752832 |