DESIGN, MODEL, AND SIMULATION OF FRANCIS WATER TURBINE FOR BAKARU HYDROELECTRIC POWER PLANT WITH NETTO HEAD OF 322,1 M AND MAXIMUM DISCHARGE OF 22,5 M3/S

Nowadays, electricity consumption in Indonesia is always rising due to the increase of electricity access and changes in people’s lifestyle. But the electricity supply itself is still dominated with conventional energy resources such as oil and coal. The diminishing reserves of non-renewable ener...

Full description

Saved in:
Bibliographic Details
Main Author: Christoper Maystro, Arnold
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/47388
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia