BACTH SCHEDULING MODEL FOR 2 DIMENSION NESTING PROCESS
As an aerospace industry that enters the global supply chain, a large variety of contracted products and limited production capacity, PTDI has production operational problems. One of the areas that have problems is the machining area of CNC router where the scheduling process of work needs to con...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/47945 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |