"DESIGN OF BORED PILE AND RETAINING WALL JOYOBOYO INTERMODA STATION, SURABAYA" DAN " DESIGN OF DRAINAGE IN JOYOBOYO INTERMODA STATION, SURABAYA"
1st Abstract: "Joyoboyo Intermoda Station is a building with 4 top structure floors, and 1 underpass floor, which was built in Surabaya City. This final project focuses on the drainage system, both roof drains and surface drains. The design process begins with processing rainfall data. Th...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/48108 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | 1st Abstract:
"Joyoboyo Intermoda Station is a building with 4 top structure floors, and 1 underpass
floor, which was built in Surabaya City. This final project focuses on the drainage
system, both roof drains and surface drains. The design process begins with processing
rainfall data.
The steps of rainfall data process are: Testing the consistency of rain data with the
double mass curve method; Determining average rainfall with the arithmetic method;
Determining plan rainfall with the normal distribution method, normal log, gumbel,
and log pearson type IIII; Testing the maximum rainfall data with the chi-square
method.
The steps of drainage system are: Determining of water flow to the roof calculated by
the rational method; Determining the dimensions of the gutter channel; Determining
the leader channel dimensions; Determination of flow of water flowing on the station
page; Determining of surface channel dimensions. The gutter channel uses a PVC pipe
with a semicircular cross section and a radius of 15 cm. While the leader channel uses
a PVC pipe with a circular cross section and 8 inch diameter. The surface channel used
is square shaped precast concrete with varying sizes, there are 400x600 mm, 500x700
mm, 600x700 mm, and 600x 800 mm."
2nd Abstract 2:
"Joyoboyo Intermoda Station is a building with 4 top structure floors, and 1 underpass
floor, which was built in Surabaya City. This final project focuses on the drainage
system, both roof drains and surface drains. The design process begins with processing
rainfall data.
The steps of rainfall data process are: Testing the consistency of rain data with the
double mass curve method; Determining average rainfall with the arithmetic method;
Determining plan rainfall with the normal distribution method, normal log, gumbel,
and log pearson type IIII; Testing the maximum rainfall data with the chi-square
method.
The steps of drainage system are: Determining of water flow to the roof calculated by
the rational method; Determining the dimensions of the gutter channel; Determining
the leader channel dimensions; Determination of flow of water flowing on the station
page; Determining of surface channel dimensions. The gutter channel uses a PVC pipe
with a semicircular cross section and a radius of 15 cm. While the leader channel uses
a PVC pipe with a circular cross section and 8 inch diameter. The surface channel used
is square shaped precast concrete with varying sizes, there are 400x600 mm, 500x700
mm, 600x700 mm, and 600x 800 mm." |
---|