WATERFLOOD OPTIMIZATION UNDER UNCERTAINTY FOR EARLY INJECTION SCHEME
Waterflood is an essential and critical part of an oilfield production lifetime. Conventional approach normally regards the injection phase as secondary recovery whose implementation occurs after the primary depletion stage. Therefore, the effect of waterflood is typically overlooked in the well pla...
Saved in:
Main Author: | Ivan, Patrick |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/48135 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
WATERFLOOD OPTIMIZATION IN MATURE WATERFLOODED FIELD USING CAPACITANCE-RESISTIVE MODEL
by: Muhammad, Umarul -
PERFORMANCE PREDICTION FULL SCALE WATERFLOOD BY PARAMETRIC ANALYSIS OF PILOT WATERFLOOD
by: SEMBIRING (NIM : 22207318), BARDANSYAH -
DEEP REINFORCEMENT LEARNING FOR OPTIMIZATION OF WATERFLOOD OPERATIONAL PARAMETERS FROM PIXELS
by: Yusran Yunus, Muhammad -
Umbilical Installation for the Champion Waterflood
by: Paul Ong Pang Awn, et al.
Published: (2021) -
COUPLED CAPACITANCE RESISTANCE MODEL AND AQUIFER MODEL FOR WATERFLOOD PERFORMANCE PREDICTION & OPTIMIZATION
by: Khalbia, Dinny