CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY

PT Sandau Nusantara Energy (PT SNE) is a subsidiary of Sandau Indonesia Business Unit that holding oil and gas exploration in Sumatra block at through its business unit PT Sandau Oil Energy (PT SOE). PT SNE is an electric power plant company that supplying electric power and steam to PT SOE. PT SNE...

Full description

Saved in:
Bibliographic Details
Main Author: Utoyo Sumawas, M.
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/48246
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:48246
spelling id-itb.:482462020-06-28T10:27:38ZCHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY Utoyo Sumawas, M. Manajemen umum Indonesia Theses power plant, operation, maintenance, organization, first line maintenance, change management. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/48246 PT Sandau Nusantara Energy (PT SNE) is a subsidiary of Sandau Indonesia Business Unit that holding oil and gas exploration in Sumatra block at through its business unit PT Sandau Oil Energy (PT SOE). PT SNE is an electric power plant company that supplying electric power and steam to PT SOE. PT SNE operate 3 units of 100-Megawatt (MW) gas turbine and generate 300,000 Boiler Cold Water Equivalent Per Day (BCWEPD) steam from CoGeneration process plant. With current situation, PT SNE had an organizational challenge in order to meet leadership expectation. Organizational capability changes due to major company structure changes since Geothermal unit business taken over by other company. Majority of key personnel move to geothermal division and back to their original entity. Maintenance team had the biggest impact since replacement employee had less experience in power plant industry. The situation impact work quality of maintenance team and as the overall result could impacting reliability and availability of plant operational. With limited personnel capability, management expectation even requires higher result since Indonesia Business Unit facing End of Contract period at August 2021. First Line Maintenance (FLM) organization structure has been developed and prepare to be implemented. Gaps need to be addressed prior implementation, since the process will take time while operational and routine outage will remain the same. Focus Group Discussion was hold involving key stakeholder. FLM expected to strengthen Operation team and reduce business process significantly, especially for operation and maintenance administration process. FLM expected to accelerate personnel capability within short of period. FLM expected to give multiply positive impact to organization. Change management study and plan need to develop to the success of FLM organization model. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Utoyo Sumawas, M.
CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY
description PT Sandau Nusantara Energy (PT SNE) is a subsidiary of Sandau Indonesia Business Unit that holding oil and gas exploration in Sumatra block at through its business unit PT Sandau Oil Energy (PT SOE). PT SNE is an electric power plant company that supplying electric power and steam to PT SOE. PT SNE operate 3 units of 100-Megawatt (MW) gas turbine and generate 300,000 Boiler Cold Water Equivalent Per Day (BCWEPD) steam from CoGeneration process plant. With current situation, PT SNE had an organizational challenge in order to meet leadership expectation. Organizational capability changes due to major company structure changes since Geothermal unit business taken over by other company. Majority of key personnel move to geothermal division and back to their original entity. Maintenance team had the biggest impact since replacement employee had less experience in power plant industry. The situation impact work quality of maintenance team and as the overall result could impacting reliability and availability of plant operational. With limited personnel capability, management expectation even requires higher result since Indonesia Business Unit facing End of Contract period at August 2021. First Line Maintenance (FLM) organization structure has been developed and prepare to be implemented. Gaps need to be addressed prior implementation, since the process will take time while operational and routine outage will remain the same. Focus Group Discussion was hold involving key stakeholder. FLM expected to strengthen Operation team and reduce business process significantly, especially for operation and maintenance administration process. FLM expected to accelerate personnel capability within short of period. FLM expected to give multiply positive impact to organization. Change management study and plan need to develop to the success of FLM organization model.
format Theses
author Utoyo Sumawas, M.
author_facet Utoyo Sumawas, M.
author_sort Utoyo Sumawas, M.
title CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY
title_short CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY
title_full CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY
title_fullStr CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY
title_full_unstemmed CHANGE MANAGEMENT STRATEGY TO IMPLEMENT FIRST LINE MAINTENANCE (FLM) AT PT SANDAU NUSANTARA ENERGY
title_sort change management strategy to implement first line maintenance (flm) at pt sandau nusantara energy
url https://digilib.itb.ac.id/gdl/view/48246
_version_ 1822927865082019840