EVALUASI EKONOMI PADA PROYEK PERTAMBANGAN EMAS BAWAH TANAH METODE CUT AND FILL DI PT XYZ DENGAN MENGGUNAKAN METODE REAL OPTION PENDEKATAN BINOMIAL LATTICE
The economic evaluation of mining project is needed to evaluate the economic feasibility and potential profits before mining production begins. Generally, economic evaluation is carried out using the Discounted Cash Flow (DCF) method. However, the DCF method has disadvantages such as the level of ri...
Saved in:
Main Author: | Anindya Jati Anggit Suka, Fidya |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/48480 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUASI EKONOMI PROYEK PERTAMBANGAN EMAS BAWAH TANAH SHRINKAGE STOPING PADA PT XYZ DENGAN MENGGUNAKAN METODE REAL OPTION
by: Pradhana Yudhanto, Pamursito -
PENERAPAN METODE REAL OPTION PENDEKATAN BINOMIAL LATTICE UNTUK MENENTUKAN SKENARIO PERTAMBANGAN TIMAH OPEN PIT TERBAIK PADA PT XYZ
by: Iqbal, Muhammad -
ECONOMIC EVALUATION OF UNDERGROUND GOLD MINING CUT AND FILL METHOD AT PT XYZ USING REAL OPTION METHOD: COMPARISON OF DISCOUNTED CASH FLOW, MONTE CARLO, BINOMIAL LATTICE AND FUZZY BINOMIAL LATTICE APPROACHES
by: Nuraini, Zafira -
ECONOMIC EVALUATION OF GOLD MINING CUT AND FILL AT PT XYZ: COMPARISON OF DISCOUNTED CASH FLOW METHODS, MONTE CARLO SIMULATION, AND REAL OPTION VALUATION WITH BINOMIAL LATTICE AND RAINBOW OPTION APPROACHES
by: Maulida Azka, Raka -
ECONOMIC EVALUATION OF UNDERGROUND SUBLEVEL STOPING GOLD MINING PROJECT IN PT XYZ USING REAL OPTION METHOD: COMPARISON OF BINOMIAL LATTICE AND FUZZY BINOMIAL LATTICE APPROACHES
by: Anarkistyani, Nilam