CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA

Human civilization will never be separated from energy. Oil and gas industry is one of the biggest energy supply contributor in Indonesia. As Indonesia’s need of energy keeps rising, various efforts are attempted by the government to cover it. Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Migas...

Full description

Saved in:
Bibliographic Details
Main Author: Putra Rachmanu, Andika
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/48982
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:48982
spelling id-itb.:489822020-08-21T06:37:30ZCORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA Putra Rachmanu, Andika Pertambangan dan operasi berkaitan Indonesia Final Project liquid loading, plunger lift, corrosion, CRA INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/48982 Human civilization will never be separated from energy. Oil and gas industry is one of the biggest energy supply contributor in Indonesia. As Indonesia’s need of energy keeps rising, various efforts are attempted by the government to cover it. Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Migas (SKK Migas) set a production target of 1,000,000 BOPD and 12,300 MMSCFD of gas in order to satisfy energy needs. This results in wide exploration activities. To cover the production target in short term, re-opening plugged well should be put into consideration. This study explore the feasibility of plunger lift application in plugged well and problems–specifically corrosion–that could occur. G-3 is a mature well that has been shut in 2008 due to severe liquid loading. Plunger lift application considered as a remedy to overcome it. Since G-3 is an old well, the down-hole equipment are prone to corrosion. Simple Excel macro usage reproduced from Guo (2007) is used to solve calculation needed for the plunger lift application. While corrosion rates are modelled using Electronic Corrosion Engineer. There are three corrosion affecting aspects studied: production rate, tubing size, and chromium level contained in tubing. Corrosion rates were modelled with those aspects in mind in order to find the outcome. Besides stated aspects, two cases of production rate are performed. First case is the lowest production rate just above the liquid loading zone and the second is the target production rate, which is slightly higher than the first case. As the calculation done, plunger lift application requirements such as minimum GLR and minimum casing pressure are determined. Turns out plunger lift are feasible to be utilized in G-3 Well. In terms of the corrosion problems, few results can be determined. It is found that these attempts could be done to lower the corrosion rate: lowering production rate, increasing tubing size, and increasing chromium percentage contained in the tubing. Chromium usage provides the best results followed by tubing size. Lowering production rate contributes relatively small difference. While usage of chromium in the tubing could significantly reduce corrosion rate, high investment are needed to do so. Since G-3 well is an old well that will be re-operated, the operation is not expected to be too long, only a mere 3-5 years could be satisfying. Taking this thoughts a little further, maintaining the well in low production rate could be the best way to maintain the well’s life for short term. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Putra Rachmanu, Andika
CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA
description Human civilization will never be separated from energy. Oil and gas industry is one of the biggest energy supply contributor in Indonesia. As Indonesia’s need of energy keeps rising, various efforts are attempted by the government to cover it. Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Migas (SKK Migas) set a production target of 1,000,000 BOPD and 12,300 MMSCFD of gas in order to satisfy energy needs. This results in wide exploration activities. To cover the production target in short term, re-opening plugged well should be put into consideration. This study explore the feasibility of plunger lift application in plugged well and problems–specifically corrosion–that could occur. G-3 is a mature well that has been shut in 2008 due to severe liquid loading. Plunger lift application considered as a remedy to overcome it. Since G-3 is an old well, the down-hole equipment are prone to corrosion. Simple Excel macro usage reproduced from Guo (2007) is used to solve calculation needed for the plunger lift application. While corrosion rates are modelled using Electronic Corrosion Engineer. There are three corrosion affecting aspects studied: production rate, tubing size, and chromium level contained in tubing. Corrosion rates were modelled with those aspects in mind in order to find the outcome. Besides stated aspects, two cases of production rate are performed. First case is the lowest production rate just above the liquid loading zone and the second is the target production rate, which is slightly higher than the first case. As the calculation done, plunger lift application requirements such as minimum GLR and minimum casing pressure are determined. Turns out plunger lift are feasible to be utilized in G-3 Well. In terms of the corrosion problems, few results can be determined. It is found that these attempts could be done to lower the corrosion rate: lowering production rate, increasing tubing size, and increasing chromium percentage contained in the tubing. Chromium usage provides the best results followed by tubing size. Lowering production rate contributes relatively small difference. While usage of chromium in the tubing could significantly reduce corrosion rate, high investment are needed to do so. Since G-3 well is an old well that will be re-operated, the operation is not expected to be too long, only a mere 3-5 years could be satisfying. Taking this thoughts a little further, maintaining the well in low production rate could be the best way to maintain the well’s life for short term.
format Final Project
author Putra Rachmanu, Andika
author_facet Putra Rachmanu, Andika
author_sort Putra Rachmanu, Andika
title CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA
title_short CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA
title_full CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA
title_fullStr CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA
title_full_unstemmed CORROSION MODELING AND RISK ASSESSMENT OF REACTIVATING LIQUID LOADED GAS WELLS WITH PLUNGER LIFT: A CASE STUDY OF WELL G-3 IN INDONESIA
title_sort corrosion modeling and risk assessment of reactivating liquid loaded gas wells with plunger lift: a case study of well g-3 in indonesia
url https://digilib.itb.ac.id/gdl/view/48982
_version_ 1822928049892491264