ANALYSIS OF FUEL BURN RATE FOR DUMPTRUCK LIEBHERR T282B & EUCLID EH4500 WITH CONSIDERING GRADE, DISTANCE, CYCLE TIME & PAYLOAD AT PIT BENDILI, PT.KALTIM PRIMA COAL
Pit Bendili is one pit owned by PT. KPC where mining is conducted by KPC itself under the Bintang Department. In this area, overburden transportation uses Truck Liebherr T282B, Euclid EH5000, EH4500, Cat789B, and Cat785C. This research is focused on the analysis of fuel burn rate (FBR) of Truck L...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/49136 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Pit Bendili is one pit owned by PT. KPC where mining is conducted by KPC itself
under the Bintang Department. In this area, overburden transportation uses Truck
Liebherr T282B, Euclid EH5000, EH4500, Cat789B, and Cat785C. This research
is focused on the analysis of fuel burn rate (FBR) of Truck Liebherr T282B and
Euclid EH4500. Due to the case that, fuel consumption for the Liebherr T282B
and Euclid EH4500 on April 2012 has exceeded the planned fuel budget
297,483.35 Litre which similar to $ 324,256.85 / Month (assuming Fuel Price = $
1.09/litre).
For the analysis, equation expressing the corelation between FBR and hauling
profile parameter is established. Considering that the equation is multivariate
function so have to be done Classical Statistic Testing, consist of (Normality Test,
Test Multicollinearity Test, Heteroscedasticity Test, Autocorrelation Test) and the
statistical hypothesis testing for each test parameters is carried out first in order
to determine the effect of each partially parameters and the influence of all
parameters simultaneously. The equation of fuel burn rate for each type truck is
given as follow:
FBR Liebherr T282B (lt/hr) = 19,5106 + 0,0059 * Jarak (m) + 5,7502 * Grade
(%) + 0,3886 * Payload (ton)
FBR Euclid EH4500 (lt/hr) = 45,9661 + 0,0074* Jarak (m) + 6,2901 * Grade
(%) + 0,2065 * Payload (ton)
The results analysis are that every 1% increasing in grade, the FBR value will
increase of 5.75 litre / hr (3.1% increased from FBR target) for truck Liebherr
T282B and 6.29 litre / hr (4% increased from FBR target) for truck Euclid
EH4500, each 500 m increasing in distance, The FBR value will increase $ 2.96
litre / hr (1.6% increased from the target FBR) for truck Liebherr T282B and
3.74 litre / hr (2.4% increased from the target FBR) for truck Euclid EH4500, 5
tons increasing, the value of FBR will increase of 1.94 litre / hr (1.05% added
from the target FBR) for truck Liebherr T282B and 1,03 litre / hr (0.7% added
from the target FBR) for truck Euclid EH4500. Related to fuel ratio, truck
Liebherr T282B has more consumptive than truck Euclid EH4500,so if there is
1% increasing in grade, there will be increase the fuel ratio (litre/ bcm) of 0.054
litre / bcm for truck Liebherr T282B and 0.047 litre / bcm for truck Euclid
EH4500. |
---|