IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM

One of the crucial things in managing geothermal production system is monitor the performance of each production well. To evaluate the performance of a production well, engineers takes up to days because of the complicated process. Therefore, engineers often find that the well's performance...

Full description

Saved in:
Bibliographic Details
Main Author: Harry Yudha Pratama, Muchamad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/49697
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:49697
spelling id-itb.:496972020-09-18T09:26:50ZIMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM Harry Yudha Pratama, Muchamad Indonesia Final Project geothermal, machine learning, artificial neural network, gradientdescent, gradientless, well performance evaluation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/49697 One of the crucial things in managing geothermal production system is monitor the performance of each production well. To evaluate the performance of a production well, engineers takes up to days because of the complicated process. Therefore, engineers often find that the well's performance drops significantly when the well was evaluated, this resulted in the effort to repair the well being very heavy, even impossible to repaired. On the other hand, in terms of technology, there have been many applications of Artificial Intelligence and Machine Learning in helping human work. It would be very good if the Artificial Neural Network (ANN) could be applied in the geothermal production system so that it could help in evaluating the well performance more quickly. The algorithm that is often used in ANN is gradient-descent, even though not all functions have a gradient. In this study, a gradient-less ANN application will be analyzed in evaluating the performance of geothermal wells. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description One of the crucial things in managing geothermal production system is monitor the performance of each production well. To evaluate the performance of a production well, engineers takes up to days because of the complicated process. Therefore, engineers often find that the well's performance drops significantly when the well was evaluated, this resulted in the effort to repair the well being very heavy, even impossible to repaired. On the other hand, in terms of technology, there have been many applications of Artificial Intelligence and Machine Learning in helping human work. It would be very good if the Artificial Neural Network (ANN) could be applied in the geothermal production system so that it could help in evaluating the well performance more quickly. The algorithm that is often used in ANN is gradient-descent, even though not all functions have a gradient. In this study, a gradient-less ANN application will be analyzed in evaluating the performance of geothermal wells.
format Final Project
author Harry Yudha Pratama, Muchamad
spellingShingle Harry Yudha Pratama, Muchamad
IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM
author_facet Harry Yudha Pratama, Muchamad
author_sort Harry Yudha Pratama, Muchamad
title IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM
title_short IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM
title_full IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM
title_fullStr IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM
title_full_unstemmed IMPLEMENTATION OF GRADIENTLESS NEURAL NETWORK FOR GEOTHERMAL PRODUCTION WELL EVALUATION AND EARLY WARNING SYSTEM
title_sort implementation of gradientless neural network for geothermal production well evaluation and early warning system
url https://digilib.itb.ac.id/gdl/view/49697
_version_ 1822000442505166848