RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT

PT. INTI (Persero) has a business line consisting of manufacture assembly, managed service, digital service, and system integrator. In the system integrator, there is one business in the form of solar panels or solar power (PLTS). Until now, PT INTI (Persero) has completed several projects relat...

Full description

Saved in:
Bibliographic Details
Main Author: Rizqy Andarysan, Raden
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/49774
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:49774
spelling id-itb.:497742020-09-19T22:49:34ZRISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT Rizqy Andarysan, Raden Manajemen umum Indonesia Theses analytical hierarchy process, risk management, PLTS INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/49774 PT. INTI (Persero) has a business line consisting of manufacture assembly, managed service, digital service, and system integrator. In the system integrator, there is one business in the form of solar panels or solar power (PLTS). Until now, PT INTI (Persero) has completed several projects related to PLTS, which include projects from Ministries, BUMN, regional government, and also from the private sector. In order to complete the project by achieving the specified target without any delay or other obstacles, in this case the Company is planning to carry out an assessment related to the risks that may appear. In completing various projects related to PLTS, there are many risks that can affect the completion of a project. If this risks is not mitigated, the company will have a negative impact which will make the target not achieved from the contribution margin. In order to complete the project by achieving the specified target without any delay or other obstacles, in this case the Company is planning to carry out an assessment related to the risks that may appear. The company plans to analyze the risk that can affect the project, so PT INTI (Persero) can mitigate the risk to maintain the project margin in PLTS for 2020. Afterall, if the Company can mitigate the risk, so the target that already set will be achieved by the Company. The analysis will be using analytical hierarchy process (AHP). After the analysis, there is no high or very high issues. Sub criteria like customer, coaching and development, recording, organizational, tender rules are at low level of risk. Sub criteria like selling product, selling price, supporting documents, business scheme, market/competition, accounts receivable, exchange, budgeting, coaching and development, work accidents, process, quality, purchase price, shipping/arrival, planning, implementation, reporting are at medium level of risk. Based on that, we accept 5 risk factors because for the low level, and reduce 16 risks for the medium level. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Rizqy Andarysan, Raden
RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
description PT. INTI (Persero) has a business line consisting of manufacture assembly, managed service, digital service, and system integrator. In the system integrator, there is one business in the form of solar panels or solar power (PLTS). Until now, PT INTI (Persero) has completed several projects related to PLTS, which include projects from Ministries, BUMN, regional government, and also from the private sector. In order to complete the project by achieving the specified target without any delay or other obstacles, in this case the Company is planning to carry out an assessment related to the risks that may appear. In completing various projects related to PLTS, there are many risks that can affect the completion of a project. If this risks is not mitigated, the company will have a negative impact which will make the target not achieved from the contribution margin. In order to complete the project by achieving the specified target without any delay or other obstacles, in this case the Company is planning to carry out an assessment related to the risks that may appear. The company plans to analyze the risk that can affect the project, so PT INTI (Persero) can mitigate the risk to maintain the project margin in PLTS for 2020. Afterall, if the Company can mitigate the risk, so the target that already set will be achieved by the Company. The analysis will be using analytical hierarchy process (AHP). After the analysis, there is no high or very high issues. Sub criteria like customer, coaching and development, recording, organizational, tender rules are at low level of risk. Sub criteria like selling product, selling price, supporting documents, business scheme, market/competition, accounts receivable, exchange, budgeting, coaching and development, work accidents, process, quality, purchase price, shipping/arrival, planning, implementation, reporting are at medium level of risk. Based on that, we accept 5 risk factors because for the low level, and reduce 16 risks for the medium level.
format Theses
author Rizqy Andarysan, Raden
author_facet Rizqy Andarysan, Raden
author_sort Rizqy Andarysan, Raden
title RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
title_short RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
title_full RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
title_fullStr RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
title_full_unstemmed RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
title_sort risk assessment in pt inti (persero) for plts project
url https://digilib.itb.ac.id/gdl/view/49774
_version_ 1822928263777878016