RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT
PT. INTI (Persero) has a business line consisting of manufacture assembly, managed service, digital service, and system integrator. In the system integrator, there is one business in the form of solar panels or solar power (PLTS). Until now, PT INTI (Persero) has completed several projects relat...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/49774 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:49774 |
---|---|
spelling |
id-itb.:497742020-09-19T22:49:34ZRISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT Rizqy Andarysan, Raden Manajemen umum Indonesia Theses analytical hierarchy process, risk management, PLTS INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/49774 PT. INTI (Persero) has a business line consisting of manufacture assembly, managed service, digital service, and system integrator. In the system integrator, there is one business in the form of solar panels or solar power (PLTS). Until now, PT INTI (Persero) has completed several projects related to PLTS, which include projects from Ministries, BUMN, regional government, and also from the private sector. In order to complete the project by achieving the specified target without any delay or other obstacles, in this case the Company is planning to carry out an assessment related to the risks that may appear. In completing various projects related to PLTS, there are many risks that can affect the completion of a project. If this risks is not mitigated, the company will have a negative impact which will make the target not achieved from the contribution margin. In order to complete the project by achieving the specified target without any delay or other obstacles, in this case the Company is planning to carry out an assessment related to the risks that may appear. The company plans to analyze the risk that can affect the project, so PT INTI (Persero) can mitigate the risk to maintain the project margin in PLTS for 2020. Afterall, if the Company can mitigate the risk, so the target that already set will be achieved by the Company. The analysis will be using analytical hierarchy process (AHP). After the analysis, there is no high or very high issues. Sub criteria like customer, coaching and development, recording, organizational, tender rules are at low level of risk. Sub criteria like selling product, selling price, supporting documents, business scheme, market/competition, accounts receivable, exchange, budgeting, coaching and development, work accidents, process, quality, purchase price, shipping/arrival, planning, implementation, reporting are at medium level of risk. Based on that, we accept 5 risk factors because for the low level, and reduce 16 risks for the medium level. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Rizqy Andarysan, Raden RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT |
description |
PT. INTI (Persero) has a business line consisting of manufacture assembly, managed
service, digital service, and system integrator. In the system integrator, there is one business
in the form of solar panels or solar power (PLTS). Until now, PT INTI (Persero) has
completed several projects related to PLTS, which include projects from Ministries,
BUMN, regional government, and also from the private sector. In order to complete the
project by achieving the specified target without any delay or other obstacles, in this case
the Company is planning to carry out an assessment related to the risks that may appear. In
completing various projects related to PLTS, there are many risks that can affect the
completion of a project. If this risks is not mitigated, the company will have a negative
impact which will make the target not achieved from the contribution margin. In order to
complete the project by achieving the specified target without any delay or other obstacles,
in this case the Company is planning to carry out an assessment related to the risks that
may appear. The company plans to analyze the risk that can affect the project, so PT INTI
(Persero) can mitigate the risk to maintain the project margin in PLTS for 2020. Afterall,
if the Company can mitigate the risk, so the target that already set will be achieved by the
Company. The analysis will be using analytical hierarchy process (AHP). After the
analysis, there is no high or very high issues. Sub criteria like customer, coaching and
development, recording, organizational, tender rules are at low level of risk. Sub criteria
like selling product, selling price, supporting documents, business scheme,
market/competition, accounts receivable, exchange, budgeting, coaching and
development, work accidents, process, quality, purchase price, shipping/arrival,
planning, implementation, reporting are at medium level of risk. Based on that, we
accept 5 risk factors because for the low level, and reduce 16 risks for the medium
level.
|
format |
Theses |
author |
Rizqy Andarysan, Raden |
author_facet |
Rizqy Andarysan, Raden |
author_sort |
Rizqy Andarysan, Raden |
title |
RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT |
title_short |
RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT |
title_full |
RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT |
title_fullStr |
RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT |
title_full_unstemmed |
RISK ASSESSMENT IN PT INTI (PERSERO) FOR PLTS PROJECT |
title_sort |
risk assessment in pt inti (persero) for plts project |
url |
https://digilib.itb.ac.id/gdl/view/49774 |
_version_ |
1822928263777878016 |