DESIGN OF THE JAKARTA LIGHT RAIL TRANSIT (LRT) EAST-WEST CORRIDOR SECTION I DEPOT â KLENDER BARU PCI GIRDER PRESTRESSED CONCRETE BRIDGE
The Jakarta Light Rail Transit (LRT) East-West Corridor is one of the corridors recommended for DKI Jakarta railroad network in 2019-2039. This corridor is planned to accommodate passengers commuting from Pulo Gebang to Joglo. The construction of this corridor is divided into two phases, the 1st pha...
Saved in:
Main Author: | Andreas B Pasaribu, Mulia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/49785 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FOUNDATION DESIGN OF JAKARTA LIGHT RAIL TRANSIT (LRT) INFRASTRUCTURE EAST-WEST CORRIDOR SECTION 1 DEPO â KLENDER BARU
by: Sutan Panglima, Naufal -
CONSTRUCTION MANAGEMENT DESIGN OF THE JAKARTA LIGHT RAIL TRANSIT (LRT) EAST â WEST CORRIDOR SECTION 1 DEPO â KLENDER BARU
by: Brena Amenda Lolita Semb, Lucia -
Computer-aided design for continuous prestressed concrete box-girder bridges
by: Fan, Sau Cheong
Published: (2011) -
Long-Term Deflection of Prestressed Concrete Box Girder Bridges Due To Creep and Shrinkage
by: Purba, Luki Hariando, et al.
Published: (2023) -
STRUCTURAL PLANNING OF PRESTRESSED BRIDGE WITH SEGMENTAL BOX GIRDER CONCRETE AND BALANCED CANTILEVER CAST IN-SITU METHOD
by: Ilham Ramadhan, Akhmad