IMPROVEMENT ON FISHING JOB PERFORMANCE ON TUBING PUMP STUCK IN HEAVY OIL OPERATION THROUGH LEAN SIX SIGMA METHODOLOGY (A CASE STUDY IN DURI FIELD - PT. CDI)
PT. Calgary Duri Indonesia (PT CDI – a disguised name) is a major Oil Company in Indonesia, PT CDI manages many fields which are located in around Duri City Riau Province. Every year Completion and Drilling (C&D) conducted 2000 workover jobs and 600 of them were conducted in Duri filed. 15% o...
Saved in:
Main Author: | Junaidi, Hendri |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/49949 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Design for Six Sigma+LeanToolset
by: Staudter, Christian, et al.
Published: (2017) -
DURI CRUDE PRIMARY ALLOCATION FACTOR PERFORMANCE IMPROVEMENT BY SIX SIGMA METHODE
by: SHALAHUDDIN (NIM : 29106358); Pembimbing Akademik : Dr. Ir. Dermawan Wibisono, M. Eng., ARIF -
INCREASING PRODUCTION CAPACITY OF RACK STEERING LINE AT PT.ABC USING LEAN SIX SIGMA METHODOLOGY
by: Harasta Fadruzil, Farhan -
OIL WELL PUT ON PRODUCTION CYCLE TIME IMPROVEMENT AT IOC-CORP USING LEAN SIX SIGMA METHODOLOGY
by: Sujana Putra, Doni -
BUSINESS PROCESS IMPROVEMENT IN CALL CENTER OPERATIONS AT XYZ MALAYSIA THROUGH THE IMPLEMENTATION OF LEAN SIX SIGMA METHODOLOGIES
by: Andini, Trisnawati