THE RAILWAY TRACK AND OPERATIONAL DESIGN OF THE JAKARTA LIGHT RAIL TRANSIT (LRT) EAST-WEST CORRIDOR PHASE I PULO GEBANG â KARET
The Jakarta Light Rail Transit (LRT) East-West Corridor is one of the corridors recommended for DKI Jakarta railroad network in 2019-2039. This corridor is planned to accommodate passengers commuting from Pulo Gebang to Joglo. The construction of this corridor is divided into two phases, the 1st...
Saved in:
Main Author: | Maudini Nurtyas, Syifa |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/49970 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FINANCIAL FEASIBILITY STUDY OF PULO GEBANG â JOGLO LIGHT RAIL TRANSIT (LRT) PROJECT DEVELOPMENT.
by: Ariyanti, Adi -
FOUNDATION DESIGN OF JAKARTA LIGHT RAIL TRANSIT (LRT) INFRASTRUCTURE EAST-WEST CORRIDOR SECTION 1 DEPO â KLENDER BARU
by: Sutan Panglima, Naufal -
CONSTRUCTION MANAGEMENT DESIGN OF THE JAKARTA LIGHT RAIL TRANSIT (LRT) EAST â WEST CORRIDOR SECTION 1 DEPO â KLENDER BARU
by: Brena Amenda Lolita Semb, Lucia -
DESIGN OF THE JAKARTA LIGHT RAIL TRANSIT (LRT) EAST-WEST CORRIDOR SECTION I DEPOT â KLENDER BARU PCI GIRDER PRESTRESSED CONCRETE BRIDGE
by: Andreas B Pasaribu, Mulia -
Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung
by: Fieldianto, Rhino